Proud to be partners with Studia BGD in Belgrade. Big Brains.
From a 3D model to a completed structure: here's a side-by-side look at how this prefab barndominium came to life. This project features a barn on the main floor with a single-family residence above, all engineered to meet demanding seismic standards. We used Simpson Strong Walls in a 'back-to-back' and '2-story stacked' configuration to achieve structural resilience and functionality. At STUDIA.BGD / 011, we led the structural design, production, and assembly documentation. Shout out to our trusted partner Red Falls Timber Co for leading the project and procurement with Simpson Strong-Tie, ZAZA TIMBER, and Rothoblaas. #BarndominiumBuild #MassTimber #GlulamStructures #PrefabConstruction #TimberEngineering #SustainableBuilding #PostAndBeam #StructuralDesign #AssemblySequence #SeismicDesign #ModernBarn #InnovativeConstruction #PrefabArchitecture #TimberFrame #BuildingWithWood