Project Highlight: Dalfen Austin Airport? Owner: Dalfen Industrial Architect: GSR Andrade Architects General Contractor: Raymond Construction Inc. The Dalfen Austin Airport project consisted of 2 tiltwall buildings, totaling 801,480 square feet.? Fun Facts: There was 3,200 feet of off site sewer which required a 300 foot long, 24 inch diameter boring to pass under a creek. The site required over 500,000 CY of import – a massive amount of material to import for a light industrial project.?The team overcame surging cost during times of extraordinary inflation across the industry.??
-
+2