At North Star, we thrive taking on challenging projects. We don't back down from big tasks; we face them head-on. Our recent project in Colorado continues to prove this each day! ? This project involves the installation of 1,430 and 230 linear-feet of 96-inch ring beam and hardwood lagging tunnel support using an Akkerman TBM for storm water relief. The crew has battled soil conditions in some portions of the first tunnel that have required soil stabilization.?The means and methods North Star crews have utilized has allowed for precise excavation and installation, ensuring the structural integrity of the tunnel while navigating through some of the most challenging ground conditions this crew has experienced!? ? Approximately 1,120 linear-feet in, and 500 linear-feet to go!?Thanks to our amazing crew and their hard work, this project is on track for success!?We're proud to add this to our portfolio.
关于我们
Although North Star Trenchless, LLC was established recently, our team has some of the most experienced, motivated and dedicated workers in this industry. With over 30 years tenure, we have completed bores and tunnels ranging from 12 inches to over 24 feet in diameter in some of the most challenging soft ground and rock conditions throughout the US. North Star is continuously exploring new modern ways to perform our work, and we embrace the latest technology available to help increase efficiency and ensure overall project success.
- 网站
-
https://www.northstartrenchless.com
North Star Trenchless, LLC的外部链接
- 所属行业
- 建筑业
- 规模
- 11-50 人
- 总部
- Rockville,Minnesota
- 类型
- 私人持股
- 领域
- Tunneling, TBM, EPBM、Pipe Jacking (Steel, RCP, Hobas、Microtunneling、Auger Boring、Hand Mining和Pipe Ramming
地点
-
主要
1351 Broadway Street W PO Box 486
US,Minnesota,Rockville,55636-0486
North Star Trenchless, LLC员工
动态
-
Remembering the brave individuals who have served and continue to serve our nation. #VeteransDay #Honor
-
Turning pipes into bones! ???? Wishing you a Halloween filled with safe haunts and spooky sights from all of us at North Star Trenchless! ?? #HappyHalloween #BuiltToThrill #SpookySeason
-
North Star Trenchless is HIRING! Apply online on our website today! https://lnkd.in/dGWMqM2U
-
?? Over the summer, our tunnel crews worked hard on another tunnel project in Texas.?The project called for installation of a 66” steel casing followed by a 48” fiberglass pipe for a new gravity sewer under Union Pacific Rail.?North Star was able to meet demands of continuous operations from TBM launch to completion!?Great job, team—keep up the excellent work! ??♂???♀???
-
It’s not every day you see an open excavation for trenchless construction in action! Our North Star team is hard at work in Texas, installing over 1,000 linear feet of auger boring and hand tunneling. Keep up the great work, team! ??♂??? #TrenchlessConstruction #NorthStarTrenchless #Teamwork
-
Patriot Day: A day of remembrance and unity. Together, we honor the past and look to the future. #NeverForget
-
Crafting strength at NorthStar Trenchless, one weld at a time—building the future with precision and power.???? #ConstructionExcellence #Welding
-
Happy Labor Day from North Star Trenchless, LLC! Today, we celebrate the contributions of our incredible teams. We have a couple of crews in El Paso and Wichita keeping everything moving over this weekend. We sincerely appreciate all of your efforts! Your hard work makes everything possible. Have a wonderful and safe weekend!
-
The new 48-inch feeder main that will connect to the Saylorville Water Treatment Plant is being installed. The initial portion was laid under Merle Hay Road next to Beaver Creek. Other portions will be installed this summer. This project is necessary to support more water capacity for the western areas of the metro, including Johnston, and is part of the expansion of the Saylorville Plant, boosting its capacity from 10 million gallons a day to 20 million gallons a day. Des Moines Water Works is overseeing this project on behalf of Central Iowa Water Works.