Midwest Engineering LLC的封面图片
Midwest Engineering LLC

Midwest Engineering LLC

土建工程

Sioux Falls,South Dakota 74 位关注者

关于我们

Midwest Engineering is a structural engineering firm that has extensive experience in structural engineering, project management, and construction. From small residential projects, to 50,000 square foot mixed used buildings, Midwest has a large array of design experience. Midwest also specializes in historic building repair, deep foundation design, and large confinement pit design.

网站
https://www.midweng.com
所属行业
土建工程
规模
2-10 人
总部
Sioux Falls,South Dakota
类型
合营企业
创立
2014

地点

Midwest Engineering LLC员工

动态

  • We recently completed a repair for a construction mistake. A contractor had cored five times through two heavily reinforced concrete beams, damaging the steel reinforcement. The EOR of the project's repair was extensive and difficult to construct, alternative repairs were desired. Midwest Engineering in partnership with Deep Foundation Group proposed an alternative repair with costs before any design had been completed. This complex solution took a lot of engineering talent and experienced installers, including calibrated anchors to 900 ft-lbs. We are the easy button, in a difficult world.

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • Midwest Engineering has extensive experience in repointing, tuck pointing, structural analysis of existing masonry, and historic preservation. We have completed projects at many Sioux Falls and surrounding historical locations. Contact us if you need help with your next project.

    • 该图片无替代文字
  • One of my favorite fast track projects. A tornado hit the Sioux Falls Kohls September 10, 2019. Three RTU's were rolled across the roof in different vectors, a 1,000 SF+ hole in the roof, and uplift pressures damaged thousands of additional square footage; based off damage we determined winds exceeded 110 mph+. Client needed the project complete for Black Friday, November 29, giving us 80 days to make the repairs. Existing bar joists at this time were 12-14 weeks out, which was not an option. Through a combination of fast tracking repairs and extensive site inspections, we were able to develop repair plans and oversee construction completing the project in under 70 days; allowing our client to have full use of the building for Black Friday.

    • 该图片无替代文字
    • 该图片无替代文字

相似主页

查看职位