MGC Contractors, Inc. 的封面图片
MGC Contractors, Inc.

MGC Contractors, Inc.

建筑业

Phoenix,Arizona 1,972 位关注者

We are an employee-owned general contractor specialized in water and wastewater production construction.

关于我们

MGC Contractors, Inc. is an Arizona Corporation having operated within Phoenix, AZ continuously since 1982. MGC Contractors, Inc. was preceded by MGC Contracting, Ltd., which began business in the Valley in 1974 and for nearly 50 years, our company has been a water industry leader. We specialize in all forms of water and wastewater general contracting including Job Order Contracting, Construction Manager at Risk, Design-Bid-Build, and Design-Build throughout Arizona, Texas, Utah, and New Mexico.

网站
https://www.mgccontractors.com
所属行业
建筑业
规模
201-500 人
总部
Phoenix,Arizona
类型
私人持股
创立
1974
领域
Well Drilling & Equipping、Water Treatment、Groundwater Treatment、Water Reservoirs、Booster Pump Stations、Lift Stations、Piplines、Wastewater Treatment、Odor Control、Water Reuse、Valve Maintenance和Disinfection

地点

  • 主要

    4110 East Elwood Street

    US,Arizona,Phoenix,85040

    获取路线
  • 223 Lucinda Dr

    US,Texas,New Braunfels,78130

    获取路线
  • 2975 West Executive Pkwy Suite 120

    US,Utah,Lehi,84043

    获取路线

MGC Contractors, Inc. 员工

动态

  • 查看MGC Contractors, Inc. 的组织主页

    1,972 位关注者

    ?? Project Update: Bitters GST Replacement ?? We’re excited to share that MGC Contractors has successfully completed the under-slab piping, and construction on the tank has begun! DN Tanks has started setting the wall panels and scaffolding. Once the scaffolding and walls are fully in place, we’ll be moving on to setting the dome panels and winding the tank. The entire process is expected to take approximately 6-8 months to complete. Stay tuned for more updates as we continue making progress! ??♂??? #MGCContractors #ProjectUpdate #DNTanks

  • 查看MGC Contractors, Inc. 的组织主页

    1,972 位关注者

    The Walnut Creek PTC Team (MGC) and Expansion Team (MWH) along with guests from Austin Water, City of Austin, CAS, Black & Veatch, Guerra, and Encore Group, met to celebrate and partner on major milestones of the near $1 billion improvement project. MGC led these ambitious leaders to reflect in a day dedicated to problem solving, communicating in crucial conversations, and strengthening bonds. ?Activities included a review from their previous teaming session, a SWOT analysis, and a team-building activity focused on the importance of communication. ?Guest speaker, John Jackson from Encore Group, led a session on scheduling and key components of a successful project schedule both from owner and contractors’ perspectives. ? These teaming sessions continue to challenge our internal and external partners to create project chemistry that lead to successful projects. MGC thanks everyone that attended, and we look forward to next year.?#MGCContractors #Milestones

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • ?? Warning: There’s poop on our table! ?? At MGC Contractors, we know water and wastewater infrastructure inside and out, and we’re here at the Utah Rural Water Conference 2025 to prove it. From treatment plants to wells to pump stations, we tackle the toughest jobs with quality, precision, and expertise—so your community’s water stays clean (even if our display says otherwise). Swing by our booth, chat with our team, and let’s talk about how we can help with your next project. Just don’t mind the ??! #WaterInfrastructure #UtahRuralWater #MGCContractors

    • 该图片无替代文字
    • 该图片无替代文字
  • ?? Progress Update: Well Site 5 Manganese Treatment Unit Project for the City of San Luis ?? The Well Site 5 New Manganese Treatment Unit project for the City of San Luis is moving forward. This project involves equipping the on-site well with a new pump and motor, and installing a Pureflow filter system to treat the well water by eliminating Manganese and other contaminants before it is pumped to the existing steel water reservoir. Key Milestones: ?? Completion of all underground piping beneath the new building slab. ?? Successful installation of two new filter vessels on the recently completed concrete supports. ?? Concrete slab forming for the filter building is in progress. The building will house the filter vessels and several pump skids. ?? Erection and coating of the new 80,000-gallon steel backwash tank by D&R Tank. ?? Finalization of underground electrical and chemical room conduits. This is MGC’s first project with the City of San Luis and Core Engineering, and we’re looking forward to seeing it through to completion in April 2025. #WaterTreatment #ManganeseRemoval #SanLuisProject #MGCContractors #Engineering #Construction #Infrastructure #Pureflow #Innovation

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • https://lnkd.in/gvmDZuuU Check out this great video from 12 News about the City of Peoria’s expansion of the Beardsley Water Treatment Facility! We’ve been proud to partner with the City since 2020 on this important project, helping to accommodate the rapid growth in the area. Our work on the Beardsley Water Treatment Plant includes: Expanding the facility from 4 MGD to 6 MGD Increasing reclaimed water supply Retrofitting the existing grit removal system Installing new secondary clarifiers Enhancing secondary process performance and sludge settling Implementing a new UV disinfection system that reduces power consumption while managing increased flow Adding a new reclaimed water pump station to serve offsite reuse customers and support the City’s reuse goals Delivering Class A+ reclaimed water to customers and re-purposing the Pleasant Valley Reservoir Watch the video to learn more about this exciting project! #water #wastewater #sustainability #infrastructure #Peoria #expansion #MGCContractors

  • MGC Safety transformed rainout days into a valuable opportunity for in-office safety training. We made the most of this time by utilizing our new structural steel wall for hands-on fall protection training and our newly acquired confined space training structure for scenario-based confined space training. We greatly appreciate the dedication of our employees in actively participating and reinforcing our commitment to a safer work environment. A special thanks to Isidra Vasquez, our Safety Manager, for her focus on ensuring our safety every single day. #MGCContractors #SafetyFirst?

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
      +1
  • MGC is currently in the final phase of the initial set of Digester Mixing System repairs. The enhancements made to the first set of digesters include the installation of new mixing pumps, as well as the replacement of all interior and exterior sludge piping. Additionally, the three existing heat exchangers and their associated piping have been replaced. The comprehensive rehabilitation of the digesters also includes interior liner repairs and exterior crack injections. Furthermore, a new Electrical Building has been constructed, featuring updated switchgear and PLC systems to power and control the newly installed equipment. The startup and commissioning of the new Mixing System are scheduled for this March. Heartfelt congratulations to the entire Clouse Project Team for a job well done! #MGCContractors #SiteRehabilitation #Digesters #ConstructionExcellence ?

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • Proud of our MGC team for coming together to complete the roofing on seven Casitas (small wood-framed bunk rooms) for Scouting America! Despite starting the day with cold Texas temperatures, our dedicated team of 10 worked hard as the day warmed up and successfully finished the task. A special thanks to Omar Guerrero, Aron Soto, and James Patterson for organizing the crew and ensuring everything ran smoothly. It’s great to see our team contributing to such a meaningful project! #Teamwork #Community #ScoutingAmerica #MGCContractors?

    • 该图片无替代文字

相似主页

查看职位