McLaren, a Division of KCI

McLaren, a Division of KCI

工程服务

Woodcliff Lake,New Jersey 12,036 位关注者

Full-Service Engineering + Surveying Solutions

关于我们

As the Northeast Division of KCI, McLaren is a leading full-service engineering firm renowned for its trusted, high quality, and innovative approach to solving complex challenges. With industry experts in multiple technical disciplines, our team provides customized solutions for projects through consultation, design, inspection, and construction management. We address every project’s specific needs with technical excellence and creative innovation.

网站
https://www.mgmclaren.com/
所属行业
工程服务
规模
1,001-5,000 人
总部
Woodcliff Lake,New Jersey
类型
私人持股
创立
1977
领域
Marine、Waterborne Transportation、Site/Civil、Survey、Structural、Bridge/Highway/Rail、Entertainment、Forensics、Engineering、Construction、Facades、Geotechnical、Coastal、Theme Park Engineering和Hydrographic Survey

地点

  • 主要

    530 Chestnut Ridge Rd

    US,New Jersey,Woodcliff Lake,07677

    获取路线
  • 218 W40th Street

    8th Floor

    US,New York,New York,10018

    获取路线
  • 601 E. Pratt Street

    Suite 302

    US,Maryland,Baltimore,21202

    获取路线
  • 201 N Magnolia Avenue

    Suite 101

    US,Florida,Orlando,32801

    获取路线
  • 5100 West Tilghman Street

    Suite 265

    US,Pennsylvania,Allentown,18104

    获取路线
  • 5 Clinton Square

    3rd Floor

    US,NY,Albany,12207

    获取路线
  • 100 S Juniper St

    3rd Floor

    US,Pennsylvania,Philadelphia,19107

    获取路线
  • 503 West Putnum Ave

    Suite 400

    US,CT,Greenwich ,06830

    获取路线
  • 2044 Beebee St

    US,California,San Luis Obispo,93401

    获取路线

McLaren, a Division of KCI员工

动态

  • 查看McLaren, a Division of KCI的公司主页,图片

    12,036 位关注者

    Ever wonder what goes into the work our #engineer divers do? So did CBS! ?? Tune in to "Mission Unstoppable" with Miranda Cosgrove this Saturday, November 23rd at 6:00 AM EST on to catch Lisa Bratton, diver and #coastal engineer in action. In her segment, Lisa brings audiences underwater to perform critical inspections of #NYC infrastructure, then takes that first-hand knowledge to better engineer solutions topside. From diving deep, to designing fixes that protect our cities, the segment gives audiences a glimpse into how marine engineering is making a positive impact on our communities! Set your reminders and dive into this can't-miss episode!?

  • 查看McLaren, a Division of KCI的公司主页,图片

    12,036 位关注者

    Charli XCX lit up Times Square with the viral neon green aesthetic featured on her recently released album "brat", making an unforgettable entrance through the TSX Broadway Stage doors (engineered by us!). The free outdoor #liveevent, in partnership with H&M, celebrated their new Holiday Collection, with Charli’s performance broadcast across #LED screens, creating a dazzling visual backdrop for the crowds below. She joined the ranks of other top artists like Post Malone, Jungkook, and Shakira, who have surprised audiences on the 18,000-square-foot LED screen system suspended 30 feet above the streets of #NYC.? ? Behind the scenes, our entertainment team worked with BNW Rigging to engineer the tilted screen backdrop and the lighting positioned behind the performer. The screen was mounted on a ModTruss Inc. frame hinged at the bottom and supported by chain hoists at the top, enabling it to tilt. Installed behind the TSX LED stage doors, the screen was designed to extend through the doors during the show and retract afterward, allowing the doors to operate without interference.?

    • Charli XCX performing on the TSX stage in Times Square, with the word "brat" displayed on a large LED screen around her
  • 查看McLaren, a Division of KCI的公司主页,图片

    12,036 位关注者

    From behind the scenes to front and center – our VP of Entertainment Engineering, Bill Gorlin, takes the spotlight as the cover star of The Inside Press, Inc.! Bill’s expertise has brought to life some of the most iconic moments in live entertainment – from flying DeLoreans on #Broadway to eight-story holiday displays in #NYC. While his work often remains invisible, it’s the foundation of the magic audiences love. Now, the engineer behind the curtain steps into the spotlight. Check out his incredible journey crafting awe-inspiring designs that bridge science, art, and imagination. Read the full article here: https://lnkd.in/eR3GMqAu

    • Cover image of The Inside Press, Inc. magazine, featuring Bill Gorlin from McLaren, a Division of KCI in front of an entertainment engineering project, the elephant sculptures in Manhattan, NYC
  • 查看McLaren, a Division of KCI的公司主页,图片

    12,036 位关注者

    Coastal engineer, Benjamin Komita, EIT, is making waves in the MDPI Journal of Marine Science and Engineering! His paper, "Natural and Engineered Ocean Inflow Projects to Improve Water Quality Through Increased Exchange," dives into methods for tackling declining water quality in estuaries and lagoons worldwide. Benjamin and his co-authors explore innovative ways to enhance #water quality by increasing ocean–estuary exchanges, a promising solution to address eutrophication and #ecosystem degradation caused by nutrient overloads, sediment, and reduced oxygen levels. The review highlights successes from projects across countries like Australia, The Netherlands, Denmark, and the U.S., showing how improved water circulation can boost nutrient reduction, enhance dissolved oxygen levels, and support healthier ecosystems. Read the full publication here: https://lnkd.in/ecwMpUrE ?

    Natural and Engineered Ocean Inflow Projects to Improve Water Quality Through Increased Exchange

    Natural and Engineered Ocean Inflow Projects to Improve Water Quality Through Increased Exchange

    mdpi.com

  • 查看McLaren, a Division of KCI的公司主页,图片

    12,036 位关注者

    Another #construction milestone has been achieved at the 470-490 Kent complex in South Williamsburg, Brooklyn! This three-tower development, located along the historic East River waterfront, continues to make significant progress. With the recent topping out, the 470 Kent Avenue building joins the other mixed-use #residential buildings 480-484 Kent Avenue and 490 Kent Avenue. ? Our team has been delivering comprehensive engineering solutions across disciplines, including site/civil, geotechnical, marine, surveying, and excavation support services. The project scope has encompassed site planning, grading and utility layouts, sediment and erosion control, permitting, builders pavement designs, and stormwater management systems. Stay tuned for further updates as we continue making progress on the transformation of this #waterfront site.?

    • An image capturing the water and the newly topped-out 470 Kent Avenue building, set against the backdrop of South Williamsburg.
  • 查看McLaren, a Division of KCI的公司主页,图片

    12,036 位关注者

    Located on Manhattan's Upper West Side, NYC Department of Parks & Recreation's Soldiers’ and Sailors’ Monument, which pays tribute to those who served in the American Civil War, is undergoing a thoughtful #restoration. Our Civil, Geotechnical, and Survey teams are helping to preserve the historical #landmark and its surrounding plaza’s integrity for future generations. The project involves meticulous attention to grading, drainage design, and site erosion mitigation to ensure the plaza remains a lasting, resilient space of honor. By updating the pathways and plaza with modern design standards, we are doing our part to uphold a piece of #NYC history, supporting NYC Park's mission to safeguard spaces that honor veterans’ legacies.?

    • Soldiers’ and Sailors’ Monument on Manhattan's Upper West Side is being restored to honor Civil War veterans and preserve history.
  • 查看McLaren, a Division of KCI的公司主页,图片

    12,036 位关注者

    The Hyatt Regency Hotel in Old Greenwich, Connecticut, recently underwent a $40 million #renovation, where our #StructuralEngineering team collaborated closely with construction teams to achieve a seamless modernization of this iconic space, including a complete redesign of the hotel’s stunning atrium. We developed design solutions to modernize the existing ramps, stairs, and various lighting and feature attachments throughout. Additionally, the new atrium includes all the necessary structural modifications to support the updated layout and architectural elements. This project has refreshed the hotel’s #hospitality space, creating a warm and welcoming atmosphere that greets guests as they enter the beautifully reimagined setting.

    • Renovated atrium at the Hyatt Regency Hotel in Old Greenwich, Connecticut.
    • Construction team works on a circular fountain in the atrium of the renovated Hyatt Regency Hotel in Old Greenwich, Connecticut.
  • 查看McLaren, a Division of KCI的公司主页,图片

    12,036 位关注者

    Upcoming Opening of the Davis Center at Harlem Meer ??? Replacing the original 1966 Lasker Pool and Rink, the Central Park Conservancy's reimagined Davis Center represents a $160 million investment in #community recreation and access to nature. Seamlessly integrated into the surrounding landscape, the Davis Center features a full-scale ice rink, an additional skating area on the Meer, a larger-than-Olympic-size pool, and a new outdoor spray pad.? ? Our engineers played an important role in the early stages of this #transformation. They developed the demolition plans for the original facility, including the strategic capping of utilities and initial soil erosion control to ensure a safe and environmentally responsible process.?? ? To make the facility accessible year-round, our entertainment team also designed a unique scaffold system inside the pool area. This #adaptable system provides a flat surface for ice in the winter and can be covered with synthetic grass in the spring and fall, creating additional recreational space for the community. - - Rendering courtesy Susan T. Rodriguez Architecture | Design and the Central Park Conservancy?

    • Rendering of the Davis Center at the Harlem Meer in Central Park.
  • 查看McLaren, a Division of KCI的公司主页,图片

    12,036 位关注者

    At this year’s American Association of Port Authorities (AAPA) Annual Convention & Expo in Boston, MA, the US Environmental Protection Agency (EPA) announced a nearly $3 billion investment in Clean Ports Program grants. This funding will empower 55 applicants in 27 states and territories nationwide with zero-emission equipment, #sustainable infrastructure, and advanced climate and air quality planning! As recognized experts in #MarineEngineering, hydrographic surveys, and dive services, members of our team, including Malcolm McLaren, PE, Joseph Acosta, JJ Woolley, P.E., Sean Dirscherl, PE, and Denisa Moss-Heitlager, were in attendance, engaging in discussions on how we can help to shape the future of the maritime landscape. Alongside over 500 industry leaders, we shared insights and explored forward-thinking solutions to drive sustainable growth and resilience across the #port industry. Congratulations to all grant recipients leading the way toward a resilient, low-impact future for the port sector!

    • McLaren Engineering Group team members Malcolm McLaren, PE, Joseph Acosta, JJ Woolley, PE, Sean Dirscherl, PE, and Denisa Moss-Heitlager at their AAPA 2024 booth.
    • AAPA Annual Convention & Expo main stage

关联主页

相似主页

查看职位