Wishing a Happy Labor Day Weekend to All! As we celebrate Labor Day, we want to extend our heartfelt gratitude to the incredible team at KCC, as well as our valued clients, partners, and vendors. Your dedication, hard work, and commitment are the foundation of our success. This weekend, take a moment to relax, recharge, and enjoy the fruits of your labor. We’re proud to work alongside such a talented and driven group of professionals, and we look forward to continuing to build together. Happy Labor Day from all of us at KCC! ?????
关于我们
Our mission at Kyle Conti Construction, is to remain a reputable, reliable, and high quality heavy-civil / environmental construction and infrastructure development company. We strive for excellence and to exceed expectations as well as to gain trust and be recognized as a leader in our industry. Our team is built of highly dedicated, innovative and experienced people who are devoted to the company’s growth and development. Through assertiveness and attention to detail we operate a safe and productive jobsite with the attitude of “getting the job done yesterday”. We hope to continue developing within the industry while always focusing on our core values.
- 网站
-
https://www.kconticonstruction.com
Kyle Conti Construction的外部链接
- 所属行业
- 建筑业
- 规模
- 51-200 人
- 总部
- Hillsborough,NJ
- 类型
- 私人持股
- 创立
- 2000
地点
-
主要
749 Clawson Ave.
US,NJ,Hillsborough,08844
Kyle Conti Construction员工
动态
-
Project Spotlight: Container Terminal LDSS Building Location: NY Harbor ? Kyle Conti Construction (KCC) is enthused to share a previous project at a container terminal in the NY Harbor.?KCC was selected as the General Contractor to accommodate a new "one over three" straddle carrier fleet, for the expedited construction of the Light Duty Straddle Carrier Shop (LDSS). This new 94’ wide by 124’ long maintenance facility was crucial due to the height requirements of the carriers, necessitating a 55’ tall entrance door that exceeded the capabilities of their existing maintenance building. Given the operational constraints of the live container terminal environment, construction highlights included precise site utilization, rerouting of utilities, and the installation of deep steel H-piles to support the 70’ tall structure. The project also involved the meticulous construction of reinforced concrete foundations to ensure stability and durability amidst the terminal’s continuous 24/7 operations. Please reach out to discuss more of this project of your next endeavor!
-
Project Spotlight: MidAtlantic Container Terminal Densification Civil infrastructure Baltimore, MD KCC is proud to showcase our recent ongoing project accomplishment. The project's goal is to transform storage efficiency by introducing electrified eRTG cranes in a specific section of the yard. Emphasizing safety, precision, and effectiveness, this initiative encompasses a wide range of tasks to ensure the success of KCC's team. Key highlights include fortifying the infrastructure with protective bollards at conductor busbar ends and electrical substation pads, implementing ground and electrical systems using reinforced concrete ductbanks for power and communications, and seamlessly integrating the infrastructure into the existing conditions. All of this is achieved through careful coordination with terminal operations to minimize disruptions and synchronize all project elements. Please don't hesitate to contact us directly to discuss further details or your next project.
-
Project Spotlight: Private Container Terminal Maintenance Mezzanine KCC constructed a Maintenance Mezzanine for a major container terminal operator.?It was a project that evolved to meet demanding equipment maintenance activities.?The contract consisted of the phased fabrication and phased installation of a new 42' tall by 140' long, multi-level structural steel Maintenance Mezzanine Structure, with access stairs, safety yellow railings, and caged ladders.?Also included, was the extension of the existing Overhead Crane Rails and the installation of a new Personnel Elevator along with a reinforced concrete elevator pit inside the Maintenance Building, which is where the Straddle Carriers are serviced and repaired.?To serve the new Mezzanine Structure, KCC provided power to the extended Crane Rails and to the new Elevator and extended the Lube Oil System to the new Maintenance Platforms.?All work was closely coordinated with in-house Project Engineering, Safety, and Mechanic & Maintenance Staff to ensure that the work was performed safely and without interruption to their operations, which run almost continuously 24/7. ?KCC is now fortunate to be working with this Terminal Operator on another similar structure.
-
Project Spotlight: "Private Fright Rail Bridge Replacement" This project aimed to replace a historical bridge on a private freight railway to improve safety and efficiency. By using precise engineering and construction methods, we reduced disruptions to railway operations during the replacement. The design meticulously prepared the steel superstructure off-site to boost onsite installation productivity. Our tasks included clearing, confirming dimensions between old and new bridges, erosion control, driving steel pipe piles, fitting steel bent caps, and setting up support for pile-to-cap beam connections. Surveying was vital for the steel piles to fit precisely with the cap beams and avoid the locations of fiber optic cables. Other duties involved removing timber bents, ensuring a thorough and efficient project completion to update the bridge to meet industry standards for durability, load capacity, and reliability. We also implemented a strategy to comply with NJDEP State Historical Society requests for the existing structure. This project showcases KCC's dedication to helping clients build a strong and dependable infrastructure network to boost the region's economic vitality.
-
Progress Spotlight: South Amboy Ferry Terminal ? The South Amboy Ferry Terminal is off to a remarkable start, with KCC crews working diligently to ensure its success.?The team has been hard at work collaborating to complete various tasks, including the clearing of vast acres of land, mass on-site excavation, installing thousands of LF of wick drains, importing significant quantities of surcharge material, and constructing a substantial MSE wall. ? ?This project is well underway and promises to be a valuable infrastructure asset for South Amboy. Stay tuned for more updates in the months ahead!
-
With the recent weather events, here is a flood resiliency project built for times like these... Project Spotlight: USACE Green Brook Flood Damage Reduction Project in Bound Brook, NJ This project involved a combination of Heavy Civil Construction as well as Building Construction Trades to complete this important flood protection facility for the Town of Bound Brook, NJ.?Working in the flood prone region of Bound Brook at the congested intersection of South Main Street and Railroad Avenue, KCC’s crew “shoe-horned” this project into a very small site that was bordered by main roads, an embankment that supported an operating passenger railroad, and an operational firehouse that had to be always kept in operation.?In addition to maintaining the flow of vehicular traffic, KCC provided a temporary pedestrian bridge to maintain pedestrian traffic on an adjacent sidewalk that was temporarily removed during the foundation work.??? Feel free to reach out directly for any other information or just to chat.
-
"Happy Holidays from all of us at Kyle Conti Construction! ??? Wishing you a Season filled with joy, warmth, and cherished moments with loved ones. May this festive time be sprinkled with success and prosperity as we look forward to a bright and productive New Year. Thank you for being part of our journey. Cheers to a wonderful holiday season!"