Kit Switch

Kit Switch

建筑业

San Francisco,California 1,402 位关注者

Ready-to-install kits for interior builds.

关于我们

At Kit Switch, we are transforming the way apartment interiors are designed and built. Installing interiors will not only be required across new construction projects, but also in the vast majority of existing buildings in need of an upgrade. Kit Switch provides an all-in-one solution to turn those spaces into quality, affordable housing by delivering ready-to-install kitchen, bathroom, and storage modules. These ready-to-install kits shorten timelines, reduce costs, and lower carbon emissions while offering a more predictable process for developers, architects, and contractors. We are a dynamic team of driven individuals, working together to create the affordability, sustainability, and opportunity we wish to see in our industry.

网站
https://www.kitswitch.com
所属行业
建筑业
规模
2-10 人
总部
San Francisco,California
类型
私人持股
创立
2021

地点

Kit Switch员工

动态

  • 查看Kit Switch的公司主页,图片

    1,402 位关注者

    We’re honored to share that Kit Switch has won the 2024 U.S. Bank Foundation Cleantech Inclusion Award! ?? This award provides a $30,000 grant and 12 months of mentorship from the U.S. Bank Foundation and Evergreen Climate Innovations, which will directly support expanding Kit Switch's mission of making building interiors more adaptable, affordable, and sustainable. We’re also thrilled to share this recognition with Calectra, whose power-to-heat thermal storage technology is driving important progress for manufacturing industries. Thank you to the U.S. Bank Foundation and Evergreen Climate Innovations for your belief in entrepreneurs tackling big climate challenges. We’re looking forward to using this opportunity to continue growing our solution and sharing our impact. Learn more here: https://lnkd.in/dePzkb7v #Cleantech #Housing #KitSwitch #ClimateInnovation #USBankFoundation

    Two female-led startups win U.S. Bank Foundation Cleantech Award

    Two female-led startups win U.S. Bank Foundation Cleantech Award

    usbank.com

  • 查看Kit Switch的公司主页,图片

    1,402 位关注者

    Kit Switch will be at the Moscone Center in San Francisco for the 45th Non Profit Housing Conference on Friday, October 4th. Booth 47. Non-Profit Housing Association of Northern California (NPH)’s Annual Conference provides affordable housing leaders with the tools, knowledge, and networks to move forward in collaborative, transformative ways that advance affordable housing and build a future where every community is one of opportunity and where everyone has a safe and affordable place to live. Please join our co-founders, Armelle Coutant and Candice Delamarre, for updates on our new product lines, latest project case studies, and to learn how Kit Switch can support your multi-family projects! We look forward to seeing you! #affordablehousing #constructioninnovation #multifamilyhousing

    • 该图片无替代文字
  • Kit Switch转发了

    查看Candice Delamarre的档案,图片

    Co-Founder & COO @ Kit Switch, Modular Interiors | Building Rehab & Adaptive Reuse | Modular Construction | Affordable Housing | Embodied Carbon & Circularity | Women in STEM | Larta Venture Fellow

    Over the past two years, Kit Switch has been fortunate to receive the support of a few wonderful Summer interns, including some extraordinarily bright, mature, and ambitious high school students coming from the StandOut Search & StandOut Connect program. Shout out to Ava Spinetti (Summer 2024) and Lauren Kim (Summer 2023). You can find more insights on the program in the article Lauren wrote below. Thank you Estelle Reardon for making this happen!

    Is StandOut Connect Worth It? My Honest Review

    Is StandOut Connect Worth It? My Honest Review

    medium.com

  • 查看Kit Switch的公司主页,图片

    1,402 位关注者

    Join Kit Switch, For ClimateTech, SecondMuse, NextCorps, and NYSERDA for an innovation showcase at Newlab on Monday, September 23rd during Climate Week NYC This event will feature the latest climate technology solutions with a full day of pitches, panels, demos, and networking. Come kick off Climate Week with a celebration of climate solutions! Register today to secure your spot: https://lu.ma/FCTShowcase #ClimateTech #ClimateWeekNYC #Sustainability #ForClimateTech #hardware #manufacturing #SecondMuse #NYSERDA #NextCorps

    For ClimateTech Innovation Showcase · Luma

    For ClimateTech Innovation Showcase · Luma

    lu.ma

  • 查看Kit Switch的公司主页,图片

    1,402 位关注者

    ?? Balancing quality with affordability isn’t always an easy equation. Multifaceted factors, including a current environment of high material and labor costs, mean that producing or renovating a unit of housing is becoming less and less affordable. In order to stay within budget, projects frequently go through value engineering exercises to cut down on unplanned expenses. Interiors, one of the last components to be installed in a project, often bear the result of swapping in lower-cost and likely less durable materials. While helping reduce construction costs, it’s important to remember that this strategy shifts costs to the operations phase of the building, with units that require more replacements and repairs over time. Thinking back to our previous post, could this be avoided with better information at project onset? In part yes, as one of the leading causes of construction delays is budget inaccuracies at project start. Clear, upfront pricing in the early stages of design, which can be achieved with pre-engineered, pre-priced kits like Kit Switch, can help avoid the budget unknowns that lead to compromising on quality during project delivery. Yet, this alone does not resolve our affordability challenge. Material costs have surged in recent years, with variability in supply chains resulting in cost overruns of up to 20%. Managing this complex supply chain, and procuring on a project-by-project basis is becoming increasingly challenging for small and larger developments alike. By designing with a set catalog of products that can be used across projects, Kit Switch pulls the lever of standardization to create economies of scale and deliver a product with durable, high quality materials, precisely manufactured and assembled, and all this at volume pricing. Between our product price and our quick turnaround 1 day delivery, we have been tracking 10-30% cost savings per door when using Kit Switch on your interior fit out. Kit Switch products are also fully removable, reconfigurable, and remanufacturable, enabling easy and targeted upgrades during maintenance, and reducing operational burden without demolition, tenant displacement, or high material waste. This year, we tested the disassembly and re-assembly of our showroom Kit-Kitchen to a new showroom location in San Francisco, demonstrating how our products not only withstand the test of time, but are also sufficiently adaptable to evolve with it. Affordability will never cease to be a priority in construction, but it is only by innovating on what levers we pull to meet that goal that we can offer affordability without compromising on quality housing for all. If you have time this week, check out our brand new Projects Page on the Kit Switch website, and stay tuned for our final post of the series coming soon! #KitSwitch #ConstructionInnovation #FutureofHousing #BuildingSolutions

    • 该图片无替代文字
  • 查看Kit Switch的公司主页,图片

    1,402 位关注者

    ?? Predictability represents a promise: that what is planned will be delivered as expected. A predictable delivery provides peace of mind, builds trust, and ensures that projects run smoothly from start to finish. Yet, in construction, predictability remains elusive with the majority of projects exceeding original budgets and schedules. Inconsistent delivery times, variable quality, and fragmented communication channels are some of the many factors exacerbating unpredictability. Each deviation can set off a chain reaction felt throughout the project’s lifecycle, leading to delays, cost overruns, and compromised quality. Kit Switch’s library of components unlocks predictability with clear upfront costs, a pre-scheduled one day install, and a step-by-step process to seamlessly take you from design to delivery. While Kit Switch modules can be used on renovation and new construction projects alike, and are also a great fit for building conversions. This is because adaptive reuse projects require meticulous coordination of trades and multiple returns to site to facilitate the addition of electrical, plumbing, and ventilation systems (MEP) along with the finish work. Last year we successfully delivered on two change of use projects. By using Kit Switch, our customers received coordination templates, site drawings, 3D models, and ultimately a product that combined casework with localized MEP systems for a plug-and-play installation. The result was a smooth, uninterrupted process, delivering high-quality results without unexpected hiccups, and ultimately completing each unit in a matter of days. These installs not only demonstrated efficiency, but also visibility, certainty, and clarity at every step of the process to ensure smooth collaboration and control for unforeseen factors. Stay tuned for our next post, where we’ll dive into how our Kit-Kitchen and Kit-Bath lines drive cost savings from pre-construction through maintenance. #KitSwitch, #ConstructionInnovation #FutureofHousing #BuildingSolutions

    • 该图片无替代文字
  • 查看Kit Switch的公司主页,图片

    1,402 位关注者

    ?? In construction, keeping on schedule is more than just a challenge– it’s a necessity. Added weeks of coordination, unexpected delays, and tenant relocations have the potential to disrupt lives, increase costs, and stretch out project timelines far beyond their original scope. At Kit Switch, we believe that construction should be efficient without compromising quality or causing undue disruption. Our approach is rooted in the principle that faster doesn't mean cutting corners. It means creating an effective and scalable plan to repeatedly deliver projects on time. We developed a library of standardized modules to streamline the design process, and we produce each module as a ready-to-install kit, reducing job site trips, coordination delays, and ultimately delivering a product that unlocks unit fit outs that complete within days, instead of the typical weeks if not months needed to install kitchens, bathrooms, lighting, and storage systems. Last year was our first year in market, during which we delivered a series of pilots, achieving a 1 day Kit Switch install on every project. As an example, the Kit Switch system enabled the gut renovation and electrification of two senior housing apartments in 3 days, from start of demolition on the first day to project completion on the third. As a baseline, renovations of this type are usually allotted 6 working days often distributed across one or likely multiple weeks. Ultimately, our approach was not just about installing kitchens quickly, but also about preserving the integrity of the building, improving jobsite workflows, and respecting the lives of the residents with an install that required no relocation time, and caused little to no intrusiveness noise, dust, or construction waste. Are you ready to turn your schedule challenges into streamlined successes? Learn more about Kit Switch’s building blocks of speedy construction on our website. #KitSwitch, #ConstructionInnovation #FutureofHousing #BuildingSolutions

    • 该图片无替代文字
  • Kit Switch转发了

    查看Candice Delamarre的档案,图片

    Co-Founder & COO @ Kit Switch, Modular Interiors | Building Rehab & Adaptive Reuse | Modular Construction | Affordable Housing | Embodied Carbon & Circularity | Women in STEM | Larta Venture Fellow

    Autodesk Research published an article about Kit Switch! ? How Kit Switch works with Autodesk to Bring Efficiencies to Design and Make ? Curious to understand what productizing apartment interiors means? Curious to know how much time and mistakes it can save? Curious to find out what the residency program led by Autodesk Research entails? Curious to know how our team leverages Autodesk software? Check out the link in the comments to find out! Thank you Caroline Jordan and Erin Arnold for guiding me through this. #modularity #innovation #construction

  • Kit Switch转发了

    查看Armelle Coutant的档案,图片

    Co-Founder & CEO @ Kit Switch: Ready-to-Install Interiors

    ?? Happening Tomorrow! This Wednesday, June 12th, we’ll dive into the logistics of offsite construction and explore its potential for efficiency, affordability, and safety. If you’re part of the BuiltWorlds ecosystem, come learn about Kit Switch's offsite supply chain, along with insights from Justin Schwaiger (KOPE) and Vikas Enti (Reframe Systems). Register here: https://lnkd.in/gWzYB3Cs

    查看BuiltWorlds的公司主页,图片

    30,231 位关注者

    Prefabrication, modular, panelization, precast—all types of construction in which a large portion of the actual construction process takes place away from the site the structure will ultimately occupy. Most professionals in the AEC world have no problems wrapping their heads around that aspect of the offsite construction process. Where things get hazy, at least for the uninitiated, is in the logistics of it all. How do you get a fully or partially assembled structure safely, efficiently, and affordably from the factory to the jobsite? Is it worth the effort? Why? On June 12, those (and more) are the questions we'll be aiming to answer in a discussion led by BuiltWorlds Research Analyst Sean Wrenn and featuring KOPE General Manager (US) Justin Schwaiger, Kit Switch Co-Founder and CEO Armelle Coutant, and Reframe Systems CEO Vikas Enti, all of whom can speak to the matter in real-world terms, using real-world examples. Register now to reserve your spot on the call: https://lnkd.in/gWzYB3Cs #ConstructionTech #BuildingTech #Modular #Prefab #Panelization #OffsiteConstruction #AECIndustry

    • 该图片无替代文字

相似主页

查看职位