We're #hiring a new BIM Coordinator/ BIM Manager-Navi Mumbai in Navi Mumbai, Maharashtra. Apply today or share this post with your network.
关于我们
Intelligent Consulting Engineers (ICE) is an independent BIM and Engineering consultancy based in Finland, India, North America, and Estonia delivering services all over the world. ICE is a team of seasoned Engineers, Architects Modelers and Technicians who apply state-of-the-art techniques along with their diverse experience to deliver impeccable design solutions. With a collective experience of over 1500+ projects spanning Asia, the US, the Middle East, and Europe, our team is adept at understanding clients’ needs and is committed to delivering projects to their satisfaction. We work on the pillars of Communication, Cooperation, and Commitment. We provide unmatched control of the entire life cycle to our clients through seamless communication between different aspects of design; inordinate cooperation between our consultants and clients’ teams and focused commitment to deliver the project successfully within the agreed time, cost, and quality. We believe in paying immense attention to the smallest details through a constant feedback mechanism. We work with our clients to create not only faultless structures but also faultless relationships that inspire great camaraderie, faith, and mutual benefits.
- 网站
-
http://www.icengg.com
Intelligent Consulting Engineers (ICE)的外部链接
- 所属行业
- 工程服务
- 规模
- 201-500 人
- 总部
- FINLAND INDIA NORTH AMERICA ESTONIA
- 类型
- 私人持股
- 创立
- 2015
- 领域
- Precast Concrete Structures - Design and Detailing、Steel Structures - Design & Detailing、Revit Modelling、architecture、scan to bim、tekla、cad、Mechanical、Electrical、Plumbing、Rebar 、CIP、Structures、Infrastructure和BIM
地点
Intelligent Consulting Engineers (ICE)员工
-
Gautam Pushkarna
Global Precast Concrete Specialist | Tekla Expert Since 2014 | Delivering Excellence from Modeling to Management on Iconic Projects Worldwide
-
Rahul Kashyap
Director - BIM Services
-
NILADRI SHEKHAR JOARDAR
Assistant Manager at ICE | Driving Business Growth and Client Relations | MEP
-
Arpit Goel
Manager - Finance@ Intelligent Consulting Engineers & Builders Private Limited | Payroll Management | Book Keeping | Budgeting & Cash Flow | Profit &…
动态
-
We're #hiring a new BIM Modeler- Mechanical/Electrical- Navi Mumbai in Navi Mumbai, Maharashtra. Apply today or share this post with your network.
-
We're #hiring a new MEP BIM Modeler_ Navi Mumbai in Navi Mumbai, Maharashtra. Apply today or share this post with your network.
-
The future of structural design is here, and it's intelligent! Generative design and parametric modeling are fundamentally reshaping structural engineering. This isn't just about incremental improvements; it's a fundamental shift towards smarter, more efficient, and sustainable structures. From optimizing material usage to enabling complex geometries, these technologies are reshaping what's possible in BIM. This translates to reduced costs and a smaller environmental footprint, showcasing our commitment to innovative and sustainable solutions. Are you ready to transform the way you design? #GenerativeDesign #ParametricModeling #BIM #ICEStructuralEngineering #Innovation #
-
We're #hiring a new Electrical BIM Modeler in Navi Mumbai, Maharashtra. Apply today or share this post with your network.
-
We're #hiring a new BIM Engineer-ACS in Navi Mumbai, Maharashtra. Apply today or share this post with your network.
-
We're #hiring a new BIM Coordinator/ BIM Manager-Navi Mumbai in Navi Mumbai, Maharashtra. Apply today or share this post with your network.
-
We're #hiring a new BIM MEP Modelers- Navi Mumbai in Navi Mumbai, Maharashtra. Apply today or share this post with your network.
-
4D is a game changer. Intelligent Consulting Engineers (ICE) we are committed to bring it to the forefront of Integrated Project Delivery from concept to completion stage. Do reach out to us in case you are interested in such use cases.
Why 4D Scheduling is Non-Negotiable for Data Center Success Data centers are the beating heart of the digital economy, but their complexity is staggering. With razor-thin margins for error and millions at stake for every hour of downtime, traditional project management just won’t cut it. Enter 4D Scheduling (BIM + Time Simulation) – the secret weapon for delivering data centers faster, cheaper, and with zero operational risk. Here’s why every project leader should prioritize it from Day 1: 🔧 1. No Room for Error in Sequencing Data centers are like 3D puzzles: miss a step, and the entire build unravels. ✅ With 4D: Power infrastructure precedes server racks. Cooling systems align with electrical pathways. No destructive rework. 🚫 Without 4D: Imagine tearing up floors to reroute cables. Ouch. ⚡ 2. Clash-Free Zones in Congested Spaces Thousands of components—HVAC, fiber trays, fire suppression—compete for the same tight spaces. ✅ With 4D: Virtual clash detection ensures pipes, ducts, and cables coexist peacefully. 🚫 Without 4D: $50k mid-build redesigns when cooling lines hit electrical busways. ⏱️ 3. Zero Downtime, Even During Upgrades Mission-critical uptime means no outages—ever. ✅ With 4D: Simulate "hot swaps" between temporary and permanent systems. Seamless transitions. 🚫 Without 4D: Testing backup power disrupts live servers. Cue SLA penalties. 📦 4. Long-Lead Equipment? No Surprises Chillers, transformers, and UPS systems take 12+ months to arrive. ✅ With 4D: Procurement timelines sync with construction milestones. Deliveries arrive just in time. 🚫 Without 4D: Generators show up late. The entire project stalls. Chaos. 🏗️ 5. Prefab & Modular Efficiency Prefab power rooms and modular IT pods cut timelines—if timed perfectly. ✅ With 4D: Deliver prefab units exactly when cranes and crews are ready. 🚫 Without 4D: Storage yards clogged with early deliveries. $$$ wasted. 👷 6. Workforce Harmony in Tight Spaces 200+ electricians, HVAC techs, and IT teams can’t all work in the same corner. ✅ With 4D: Zone-based scheduling prevents trade clashes. No overtime, no bottlenecks. 🚫 Without 4D: Teams trip over each other. Productivity plummets. 📈 7. Flawless Handover, Faster ROI 10,000+ tests (fire drills, load balancing, failovers) must pass on the first try. ✅ With 4D: Simulate commissioning phases to align testing with build stages. 🚫 Without 4D: Delayed sign-offs. Missed revenue deadlines. Investors panic. The Bottom Line: In an industry where 1 hour of downtime = $260,000+ (Ponemon Institute), 4D scheduling isn’t optional—it’s business-critical. ✅ Slash costs by 20% with zero rework. ✅ Cut timelines by 30% via optimized workflows. ✅ Guarantee uptime from Day 1. At Intelligent Consulting Engineers (ICE), we have built expertise and have experience in quality services in Data Centre BIM delivery. #DataCenters #4DScheduling #BIM #ProjectManagement #ConstructionTech #Innovation #OperationalExcellence
-
Why 4D Scheduling is Non-Negotiable for Data Center Success Data centers are the beating heart of the digital economy, but their complexity is staggering. With razor-thin margins for error and millions at stake for every hour of downtime, traditional project management just won’t cut it. Enter 4D Scheduling (BIM + Time Simulation) – the secret weapon for delivering data centers faster, cheaper, and with zero operational risk. Here’s why every project leader should prioritize it from Day 1: 🔧 1. No Room for Error in Sequencing Data centers are like 3D puzzles: miss a step, and the entire build unravels. ✅ With 4D: Power infrastructure precedes server racks. Cooling systems align with electrical pathways. No destructive rework. 🚫 Without 4D: Imagine tearing up floors to reroute cables. Ouch. ⚡ 2. Clash-Free Zones in Congested Spaces Thousands of components—HVAC, fiber trays, fire suppression—compete for the same tight spaces. ✅ With 4D: Virtual clash detection ensures pipes, ducts, and cables coexist peacefully. 🚫 Without 4D: $50k mid-build redesigns when cooling lines hit electrical busways. ⏱️ 3. Zero Downtime, Even During Upgrades Mission-critical uptime means no outages—ever. ✅ With 4D: Simulate "hot swaps" between temporary and permanent systems. Seamless transitions. 🚫 Without 4D: Testing backup power disrupts live servers. Cue SLA penalties. 📦 4. Long-Lead Equipment? No Surprises Chillers, transformers, and UPS systems take 12+ months to arrive. ✅ With 4D: Procurement timelines sync with construction milestones. Deliveries arrive just in time. 🚫 Without 4D: Generators show up late. The entire project stalls. Chaos. 🏗️ 5. Prefab & Modular Efficiency Prefab power rooms and modular IT pods cut timelines—if timed perfectly. ✅ With 4D: Deliver prefab units exactly when cranes and crews are ready. 🚫 Without 4D: Storage yards clogged with early deliveries. $$$ wasted. 👷 6. Workforce Harmony in Tight Spaces 200+ electricians, HVAC techs, and IT teams can’t all work in the same corner. ✅ With 4D: Zone-based scheduling prevents trade clashes. No overtime, no bottlenecks. 🚫 Without 4D: Teams trip over each other. Productivity plummets. 📈 7. Flawless Handover, Faster ROI 10,000+ tests (fire drills, load balancing, failovers) must pass on the first try. ✅ With 4D: Simulate commissioning phases to align testing with build stages. 🚫 Without 4D: Delayed sign-offs. Missed revenue deadlines. Investors panic. The Bottom Line: In an industry where 1 hour of downtime = $260,000+ (Ponemon Institute), 4D scheduling isn’t optional—it’s business-critical. ✅ Slash costs by 20% with zero rework. ✅ Cut timelines by 30% via optimized workflows. ✅ Guarantee uptime from Day 1. At Intelligent Consulting Engineers (ICE), we have built expertise and have experience in quality services in Data Centre BIM delivery. #DataCenters #4DScheduling #BIM #ProjectManagement #ConstructionTech #Innovation #OperationalExcellence