Integrity Grading & Excavating, Inc.

Integrity Grading & Excavating, Inc.

建筑业

Schofield,Wisconsin 558 位关注者

Core Values: Integrity, Innovative, Reputation, Respect, Committment, Driven

关于我们

Established 2006, Integrity Grading & Excavating, Inc. is a diversified construction firm. IGE conducts its operations in the Midwest with the bulk of its work performed statewide throughout Wisconsin. Integrity has locations in Madison, WI & Schofield, WI. Integrity provides excavating and utility services in commercial site development, roadways, environmental cleanup, general excavation, sewer and water utilities, along with snow removal.

网站
https://www.integrityge.com
所属行业
建筑业
规模
51-200 人
总部
Schofield,Wisconsin
类型
私人持股
创立
2006
领域
WISDOT Roadway、Site Development、FRAC Mine Development、Landfill Operations、Snow Removal、Sewer and Water Utilities、Utilities、Specialty Site Work、Power Plant Site Work、GPS TopCon、Design Build Earth Projects、Lake & Pond Construction、Roadways、Environmental Clean Up和Cranberry Bogs

地点

  • 主要

    605 Grossman Drive

    US,Wisconsin,Schofield,54476

    获取路线
  • 4001 Felland Rd

    #113

    US,Wisconsin,Madison,53718

    获取路线

Integrity Grading & Excavating, Inc.员工

动态

  • Today, we take a moment to express our deepest gratitude to all the veterans who have served and sacrificed for our country. Your courage, dedication, and unwavering commitment to protecting our freedoms are truly appreciated. From all of us at Integrity Grading & Excavating, thank you for your service and for the sacrifices you’ve made. Your bravery continues to inspire us every day.

    • 该图片无替代文字
  • Integrity Grading & Excavating, Inc.转发了

    Cory Tomczyk was clearly enjoying himself – full of smiles and booming laughter – while walking a WTBA-member worksite in Wausau this week. “I’m a hands-on guy and I don’t mind getting dirty, but I need to do this more often,” Tomczyk said after an hour-long tour of Integrity Grading & Excavating, Inc.'s reconstruction job on Stewart Avenue.? “It’s really always impressive to see the great work.” Still, the State Senator from Mosinee had to shake his head when IGE crews showed him a prime example of the type of issue his Compensable Utility Delay bill (signed into law in December) aims to prevent.? A fiber line, which was supposed to be moved ahead of construction in April, lays right where crews plan to make a subgrade cut and widen the road to 36 feet. “My job is to make Madison help you guys get your job done better,” Tomczyk pledged. IGE says they’re working with the utility to get the line moved before it gets to the point of seeking compensation.? Instead, a very rainy spring and summer has been the bigger challenge, pushing IGE and its subs about two weeks behind schedule. The project replaces the aging asphalt along a 1.25-mile stretch into and out of downtown Wausau, places new water and sewer lines, and adds a multi-use path. “I think the pedestrians will like (the new path) a lot better and it’s a good local project,” IGE Operations Manager Brandon Barden told WTBA.? “It’s bringing some new stuff to homeowners, wider turning radiuses, so traffic should move more freely.” Barden is a member of the WTBA of Tomorrow Council.? Members are working with WTBA’s Director of Government Affairs Elise Nelson to line up lawmaker project tours all across Wisconsin this summer. Tuesday’s visit gave IGE President Dan Weinkauf the chance to thank Tomczyk for his efforts on the utility bill and offer him and State Rep. Patrick Snyder (R-Schofield) some industry insights to ponder. “This particular project is so relevant for central Wisconsin, because you have Integrity here based right around the Wausau area, you’ve got subcontractors that are from central Wisconsin, so it really is a big impact for here, not only getting the road fixed but economically,” Snyder said. #bootsontheground #roadconstruction #wtbaoftomorrow

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
      +7
  • Integrity Grading & Excavating, Inc.转发了

    Cory Tomczyk was clearly enjoying himself – full of smiles and booming laughter – while walking a WTBA-member worksite in Wausau this week. “I’m a hands-on guy and I don’t mind getting dirty, but I need to do this more often,” Tomczyk said after an hour-long tour of Integrity Grading & Excavating, Inc.'s reconstruction job on Stewart Avenue.? “It’s really always impressive to see the great work.” Still, the State Senator from Mosinee had to shake his head when IGE crews showed him a prime example of the type of issue his Compensable Utility Delay bill (signed into law in December) aims to prevent.? A fiber line, which was supposed to be moved ahead of construction in April, lays right where crews plan to make a subgrade cut and widen the road to 36 feet. “My job is to make Madison help you guys get your job done better,” Tomczyk pledged. IGE says they’re working with the utility to get the line moved before it gets to the point of seeking compensation.? Instead, a very rainy spring and summer has been the bigger challenge, pushing IGE and its subs about two weeks behind schedule. The project replaces the aging asphalt along a 1.25-mile stretch into and out of downtown Wausau, places new water and sewer lines, and adds a multi-use path. “I think the pedestrians will like (the new path) a lot better and it’s a good local project,” IGE Operations Manager Brandon Barden told WTBA.? “It’s bringing some new stuff to homeowners, wider turning radiuses, so traffic should move more freely.” Barden is a member of the WTBA of Tomorrow Council.? Members are working with WTBA’s Director of Government Affairs Elise Nelson to line up lawmaker project tours all across Wisconsin this summer. Tuesday’s visit gave IGE President Dan Weinkauf the chance to thank Tomczyk for his efforts on the utility bill and offer him and State Rep. Patrick Snyder (R-Schofield) some industry insights to ponder. “This particular project is so relevant for central Wisconsin, because you have Integrity here based right around the Wausau area, you’ve got subcontractors that are from central Wisconsin, so it really is a big impact for here, not only getting the road fixed but economically,” Snyder said. #bootsontheground #roadconstruction #wtbaoftomorrow

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
      +7
  • Absolutely fantastic to see State Senator Cory Tomczyk engaging directly with our work on Stewart Avenue in Wausau! His hands-on approach and commitment to supporting our industry are truly commendable. Special thanks to our dedicated IGE crews for showcasing the challenges and triumphs of this reconstruction project. Your hard work and resilience, especially through the weather setbacks, are the backbone of our success. Together, we're not just building roads; we're building a stronger community. #IntegrityGradingExcavating #CommunityBuilding #Infrastructure #Wausau #Wisconsin

    Cory Tomczyk was clearly enjoying himself – full of smiles and booming laughter – while walking a WTBA-member worksite in Wausau this week. “I’m a hands-on guy and I don’t mind getting dirty, but I need to do this more often,” Tomczyk said after an hour-long tour of Integrity Grading & Excavating, Inc.'s reconstruction job on Stewart Avenue.? “It’s really always impressive to see the great work.” Still, the State Senator from Mosinee had to shake his head when IGE crews showed him a prime example of the type of issue his Compensable Utility Delay bill (signed into law in December) aims to prevent.? A fiber line, which was supposed to be moved ahead of construction in April, lays right where crews plan to make a subgrade cut and widen the road to 36 feet. “My job is to make Madison help you guys get your job done better,” Tomczyk pledged. IGE says they’re working with the utility to get the line moved before it gets to the point of seeking compensation.? Instead, a very rainy spring and summer has been the bigger challenge, pushing IGE and its subs about two weeks behind schedule. The project replaces the aging asphalt along a 1.25-mile stretch into and out of downtown Wausau, places new water and sewer lines, and adds a multi-use path. “I think the pedestrians will like (the new path) a lot better and it’s a good local project,” IGE Operations Manager Brandon Barden told WTBA.? “It’s bringing some new stuff to homeowners, wider turning radiuses, so traffic should move more freely.” Barden is a member of the WTBA of Tomorrow Council.? Members are working with WTBA’s Director of Government Affairs Elise Nelson to line up lawmaker project tours all across Wisconsin this summer. Tuesday’s visit gave IGE President Dan Weinkauf the chance to thank Tomczyk for his efforts on the utility bill and offer him and State Rep. Patrick Snyder (R-Schofield) some industry insights to ponder. “This particular project is so relevant for central Wisconsin, because you have Integrity here based right around the Wausau area, you’ve got subcontractors that are from central Wisconsin, so it really is a big impact for here, not only getting the road fixed but economically,” Snyder said. #bootsontheground #roadconstruction #wtbaoftomorrow

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
      +7
  • Integrity Grading & Excavating, Inc.转发了

    查看Commercial Brokers Group, Inc.的公司主页,图片

    280 位关注者

    ?? PLATINUM SPONSOR HIGHLIGHT | Integrity Grading & Excavating, Inc. ?? Integrity Grading & Excavating, Inc. is an excavating and utility services company that operates in the Midwest. The bulk of their work is performed throughout Wisconsin with locations in Madison and Schofield. They believe in building long-lasting relationships with clients and team members through respect, commitment and innovation. Each project is a new challenge that requires innovation and drive to take through to completion. Throughout the years, IGE has cemented themselves in the Madison area with a reputation as a value-driven, grading and excavating ?? leader. To learn more about their business, what they do, and how they've become a well known name in Wisconsin, visit their website integrityge.com ?? #platinumsponsor #madisonexcavationservices #madisonutilityservices #cbgmadisonsponsor #sponsorships #commercialbrokersgroup

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字

相似主页

查看职位