??? Big News from Greenland!??? We are thrilled to announce that SAW Greenland (a Joint Venture) has been awarded a $36 million federal contract for the construction of a new 13,700-square-foot boiler plant at the VA Medical Center in Temple, Texas! ??? This multi-year project will replace the existing boiler plant and integrate it into the steam distribution system that serves the entire medical campus - enhancing reliability and efficiency for the veterans and medical professionals who depend on it every day. ? This win is especially meaningful as Temple is located near the Waco VA Medical Center, where our team successfully delivered two district energy projects over a decade ago. It’s a full-circle moment that reinforces our long-standing commitment to improving critical VA healthcare infrastructure. ? At Greenland, we take great pride in delivering mission-critical infrastructure for federal agencies. This award is another milestone in our ongoing work in federal energy and infrastructure construction, and we can’t wait to get started! ? Stay tuned for updates as we finalize the project schedule! SAW Contracting, Inc.
Greenland Enterprises, Inc.
建筑业
Newport News,Virginia 617 位关注者
A national Construction Management firm specializing in the design and construction of district energy applications.
关于我们
Greenland is a national Construction Management firm that provides engineering, procurement, and construction services for turnkey district energy applications and mission-critical facilities. Our unique approach places equal emphasis on design and construction to maximize efficiency, life-cycle costs and owner investment. Our talented team applies their expertise on projects throughout the U.S. and we’re proud of the strong relationships we develop with owners, architects and engineers, and subcontractors and vendors.
- 网站
-
https://greenlandenterprises.com
Greenland Enterprises, Inc.的外部链接
- 所属行业
- 建筑业
- 规模
- 11-50 人
- 总部
- Newport News,Virginia
- 类型
- 私人持股
- 创立
- 2008
- 领域
- Central Utility Plant Design-Build、Engineering and Systems Analysis、Combined Heat and Power Plants、Custom Air Handling Systems、Chiller and Boiler Replacement、Central Plant Const.、Cooling Tower Replacement和Controls Commissioning
地点
-
主要
2713 Magruder Blvd
US,Virginia,Newport News,23666
Greenland Enterprises, Inc.员工
动态
-
Exciting progress on our Replace Downtown Boiler Systems project in Augusta, GA!??? Our Cleaver-Brooks firetube boilers have officially arrived on-site and are now rigged into place on their concrete housekeeping pads. This complex operation was a true team effort, with seamless coordination between our Joint Venture team, our Trade Partner, Mann Mechanical, and the expert rigging crew at RIGUPATL. The boilers were offloaded using industrial-sized forklifts equipped with jib-crane attachments and a counter-balance weight system, then carefully set onto equipment skates. From there, a remote-controlled hydraulic skate guided them into their final position inside the boiler plant. Next up: installing the boiler stack system!??? Stay tuned as we continue pushing forward. SAW Contracting, Inc. Greenland Enterprises, Inc. Mann Mechanical Company, Inc. RIGUPATL Boiler Supply Company Cleaver-Brooks
-
-
Greenland Enterprises, Inc.转发了
Greenland Enterprises, Inc.?has achieved significant growth while maintaining an ethos of “doing more with less,” reaching a series of impressive milestones through this approach. Specializing in engineering, procurement, and construction (EPC) for district energy projects and critical mission facilities, Greenland provides a range of professional services. These include designing and constructing central utility plants, combined heat and power (CHP) plants, and complex fueling installations for federal and educational sectors. In addition to its technical achievements, Greenland’s growth reflects a deliberate focus on employee empowerment and sustainability. Founded in 2008 by former Trane employees Elton Roller Jr. and Scott Werszner, Greenland’s origin story highlights an opportunity in the federal construction space for enhanced delivery methods and higher standards on large-scale projects. Both founders brought expertise from performance contracts emphasizing efficiency and innovation. They recognized a niche for flexible services in critical infrastructure, especially within the federal government. “With small business flexibility and large business knowledge,” the team explains, “Greenland started delivering their first central utility plant upgrades in 2009,” initiating a journey that would lead to numerous successes. Cleaver-Brooks Klenzoid, Inc. WARE #LeanBuilding #SustainableGrowth #EfficientDesign #SmartBuildingSolutions #ConstructionProgress #FutureReady #ResourceEfficiency #BuiltForTomorrow
-
The Joint Venture recently achieved another major milestone on our boiler plant project at Hill Air Force Base in UT. The eight existing boilers have been removed from Building 260 and the team can now press forward with the concrete demo. These boilers will soon be replaced with five new 48,000 PPH 9 ppm NOx boilers. To accomplish this effort, the existing plant's south doors were demolished and the entryway was expanded to provide enough clearance for the removal. Over the course of several days, each boiler was then shrink-wrapped, placed on hydraulic skates, moved outside, and loaded onto a flatbed via crane rigging. The limited interior space required careful planning and sequencing. Congratulations to our amazing team in successfully executing this critical work! SAW Contracting, Inc. Greenland Enterprises, Inc. RK Mechanical, Eagle Environmental, Inc. Intermountain Rigging and Heavy Haul Wagstaff Crane & Rigging
-
-
Our Joint Venture team has successfully removed the underground fuel storage tanks on the?Replace Boilers in Building 10?project at the VA Medical Center in Providence, RI. The effort involved careful excavation, detaching tie-down straps, and using rigging/lifting lugs to remove a 2,500-gallon diesel tank and a 20,000-gallon #2 fuel oil tank. This key milestone allows us to move forward with the next phase of the project, which includes a 500 SF addition to house a new transformer. Great work by the team in reaching this critical point! SAW Contracting, Inc. Greenland Enterprises, Inc.
-
-
We’re excited to share that our Design-Build Repair of Boilers project at Hill Air Force Base in Utah was recently featured in the September 2024 edition of ENR Mountain States Industry News. The article features the collaborative efforts of Greenland Enterprises, Inc., SAW Contracting, Inc. (our Joint Venture Partner), and RMF Engineering, Inc. (our Design Partner) on this important project. We’re proud to be recognized for our work alongside such great partners. Click through to see the article and check out the highlighted sections!
-
In under 90 days,?Greenland?Enterprises and SAW Contracting (a Joint Venture) constructed a temporary steam plant capable of producing 168,000 PPH of steam for our boiler plant project at Hill AFB in UT. RMF Engineering, Inc. RK Mechanical Cache Valley Electric WARE
-
-
Last week, we shared a great video highlighting Central Energy Plant upgrades at the Dallas VA Medical Center. Here are some additional photos. The project includes 6,000 tons of new heat rejection equipment and?other energy upgrades. Infinity Contractors E-MC Electrical, Inc. Gliden Industries, LLC
-