Housing and Ag Buildings Go with Structural Insulated Panels construction for housing field workers and for all agricultural buildings. Hurricane wind rated to 220 mph. Maintenance free unlike trailers, just sweep and mop. Trailers and metal Ag buildings get blown apart. Equipment gets damaged, you pay the insurance deductible, and you lose field work time. Jim Ashworth (813) 299-6051 email [email protected]
Florida Farmworker Housing
建材
Tampa,Florida 93 位关注者
Develop a new camp or expand on your current one with farmworker housing direct from the factory.
关于我们
Everything a migrant labor camp needs to develop a new camp or expand an existing camp is provided for with permitting, surveying, engineering, environmental studies, and project management. Licensed real estate agents and land investigations services prior to purchase. Agricultural Buildings
- 网站
-
https://floridafarmworkerhousing.com
Florida Farmworker Housing的外部链接
- 所属行业
- 建材
- 规模
- 2-10 人
- 总部
- Tampa,Florida
- 类型
- 自有
- 创立
- 2016
- 领域
- Agricultural Buildings. Coolers, packing houses, bunkhouses, storage.
地点
-
主要
US,Florida,Tampa
动态
-
SB 1082 was vetoed by Gov Desantis on June 28. There is a way to gain approval for the construction of a farm worker housing camp.
HOUSING and Ag BUILDINGS Go with Structural Insulated Panels when you need field worker housing and agricultural buildings. Panels are noncombustible, wind rated to 220 mph and maintenance free. Ready for use within 45 days after the concrete pad is cured. Trailers and metal farm buildings can be blown apart in high winds resulting in damaged equipment, loss of the insurance deductible, and loss of field work time. CONTACT: Jim Ashworth (813) 299-6051 email [email protected]
-
BEWARE OF THESE CONTRACT TERMS. When entering into a contract with an Engineering and/or Environmental Consulting firm take notice of: A. Scope of work is limited to the work agreed upon as stated in the contract. B. Engineering/Environmental firm cannot guarantee the action of govermental agencies during the project review and approval process. Terms A and B could result in the project costs being billed under the fee schedule. President $225 / hr. VP $200 / hr. Engineer / $175 / hr. etc. They'll blame their incompetence on the agency. YOU PAY!!!