#NationalSurveyorsWeek highlights the expertise and skills of surveyors while honoring their invaluable contributions to our communities. We asked our Marine Project Manager, Chandler Malley, about his opinion of the importance of surveying!
关于我们
Broad Vision. Expert Focus.
- 网站
-
https://www.ddgpc.com
DDG的外部链接
- 所属行业
- 专业服务
- 规模
- 51-200 人
- 总部
- Multiple Locations
- 类型
- 私人持股
- 创立
- 1997
- 领域
- Civil Engineering、Coastal Engineering、Structural Engineering、Landscape Architecture、Architecture、Wetlands + Environmental、Project Management、Transportation Engineering、Water Resources和Grant Advisory
地点
-
主要
US,Multiple Locations
DDG员工
动态
-
?Project Spotlight: East Milton and Chemin Metairie Parkway Roundabout DDG has performed right-of-way and topographic surveys to aid in the design process for Neel-Schaffer, Inc. DDG coordinated the acquisition of title take-offs, did our own additional research, and performed property surveys for all affected parcels at the Roundabout. DDG is in the process of preparing right-of-way property maps needed to construct the roundabout. DDG coordinated Quality Level “B” Utility Locate within the existing and proposed rights-of-way to locate any potential design conflicts. All work has been performed to the standards set forth in the Addendum “A” section of the Location and Survey Manual.
-
-
Happy Surveyor’s Week! DDG’s licensed surveyors and survey personnel have over 100 years of combined surveying experience in topographic, property boundary, and hydrographic surveys. Our team raises the bar by utilizing the latest and most efficient methods for collecting and staking data points for all types of surveys.
-
-
?Project Spotlight: The Bayou Church DDG provided civil engineering, landscape architecture, and surveying services for the development of a new 32,800-square-foot church expansion. This expansion included a theater, café, broadcast studio, and multiple classrooms, designed to enhance functionality and community engagement. The project scope also included a parking lot, sidewalk, and drainage improvements, ensuring improved accessibility and infrastructure. The project was successfully completed in 2024.
-
-
We’re so grateful Matt chose to come back to Thibodaux and explore engineering opportunities… We would not be who we are today without him!
Is the time right to move back home? Louisiana natives who have already completed the round trip share their answers. Read the homecoming story of Matthew Newchurch, President and CEO of DDG here. https://lnkd.in/gcfHT2HE
-
-
?#Eweek2025 Project Spotlight: Country Day Artificial Turf Field Improvements The scope of this project included the design of an artificial turf field to replace the existing grass field at Metairie Park Country Day. Our team was responsible for the field grades, perimeter curb, artificial turf base design, subsurface drainage, and stormwater detention system. DDG was the project lead for the required permits through Jefferson Parish. DDG was retained through construction for construction administration and to assist with obtaining a certificate of completion from Jefferson Parish.
-
-
#NationalEngineersWeek celebrates the pivotal contributions of engineers in our society. We asked Project Manager, Claiton Johnson, PE, about his insights on the importance of engineering! #Eweek2025
-