Chennai Metro Rail Limited的封面图片
Chennai Metro Rail Limited

Chennai Metro Rail Limited

铁路运输

Chennai,Tamil Nadu 20,157 位关注者

Welcome to the official LinkedIn page of Chennai Metro Rail Limited

关于我们

The Government of Tamil Nadu created a Special Purpose Vehicle (SPV) for implementing the Chennai Metro Rail Project. This SPV named as "Chennai Metro Rail Limited" was incorporated on 03.12.2007 under the Companies Act. It has now been converted into a Joint Venture of the Government of India and Government of Tamil Nadu with equal equity holding.

网站
https://chennaimetrorail.org/
所属行业
铁路运输
规模
201-500 人
总部
Chennai,Tamil Nadu
类型
政府机构
创立
2007

地点

  • 主要

    327, Anna Salai, Rathna Nagar, Nandanam

    IN,Tamil Nadu,Chennai,600035

    获取路线

Chennai Metro Rail Limited员工

动态

  • 查看Chennai Metro Rail Limited的组织主页

    20,157 位关注者

    Detailed Project Report for Metro Rail Transit System between Koyambedu and Pattabiram (Outer Ring Road) Detailed Project Report (DPR) for recommendation of extension of Metro Rail between Koyambedu and Pattabiram (Outer Ring Road) was submitted by Thiru. M.A. Siddique, I.A.S., Principal Secretary to Government, Managing Director, CMRL to Thiru. Dr. K Gopal IAS., Additional Chief Secretary to Government, Special Initiatives, Government of Tamil Nadu at Secretariat, Chennai today (21.02.2025). Thiru. T. Archunan, Director (Projects) and other Senior Officials of CMRL were present during the occasion. The proposed Metro line is starting from existing Koyambedu metro station, passing through Padi Pudhu Nagar, Mugappair, Ambattur, Thirumullaivoyal, Avadiand ending at Pattabiram (ORR), which will provide seamless connectivity to the transport hubs like Ambattur Easte Terminus & Ambattur OT, Avadi Railway station & Bus terminus and Outer Ring Road (ORR). It is integrated with the Highway flyover at three locations (i.e. Ambattur Estate Bus Depot junction, Near Dunlop, in front ?Avadi bus stand) to optimizes the project cost and implementation time. The salient features of Detailed Project Report (DPR) are as follows. ? Total Length Corridor: 21.76 km ? No. of Elevated Stations: 19 Nos ? Estimated Completion cost of integrated structure: Rs 9,744 Crores. (including three flyover integration) #chennaimetro #cmrl #chennai #metrorail

    • 该图片无替代文字
  • First Tunnel Boring Machine launched from Corridor 5 of CMRL Phase 2 project TBM Kurinji launched at Kolathur Ramp. Chennai Metro Rail Limited has commenced the expansion of the Chennai city’s metro rail network as part of Phase II after the successful completion of the Phase I and Phase I Extension Corridors in stages since June 2015 and the growing ridership in Corridors 1&2. Now, CMRL has ventured into an extensive infrastructure development in the city comprising of three more corridors of metro rail for a total length of 118.9 km being funded by several multi-national funding agencies including the JICA, ADB, AIIB & NDB. Corridor 5 begins at Madhavaram Milk colony and connects through Koyambedu, Porur, Alandur and other residential/commercial development of the city to Shollinganallur for a total length of 47.0 km with 5 underground stations and 39 elevated stations. Four TBMs, each named after distinct Tamil landscapes (Kurinji, Mullai, Marutham, and Neithal), will be deployed for Corridor 5. TBM Kurinji, the first to be launched today (19-02-2025), will bore a 246-meter tunnel from Kolathur Ramp towards Kolathur Station (upline) and is expected to reach in June 2025. It will then be retrieved and relaunched from the south shaft to tunnel towards Srinivasa Nagar (1.06 kms). The second TBM, Mullai, is expected to arrive by the end of March 2025 and will begin tunnelling adjacent to Villivakkam Railway Station towards VillivakkamBus Terminus (603 meters). The remaining two TBMs will be launched based on site readiness. The 7.8 km underground tunnel section with twin tunnel of 3.9 km each of Corridor 5, including five underground stations from Kolathur Ramp to NathamuniRamp are being executed through M/s.Tata Projects limited and have to mobilize a total of 4 TBMs for the works. Additional Chief Secretary, Special Initiatives, Government of Tamil Nadu Dr. K. Gopal I.A.S., along with CMRL Director Thiru. T. Archunan, (Project), Thiru. Livingstone, CGM (PP&D), General Consultant Team Leader Tony Burchell and Thiru. Usman Sharief, Chief Resident Engineer, M/s Tata Projects and other officials and staff of CMRL, GC and Tata Projects visited the site. #chennaimetro #cmrl #chennai #metrorail #phase2

    • 该图片无替代文字
  • 76th?Republic Day Celebrated at?MetroS?CMRL Head Office CMRL celebrated the 76th?Republic Day at?MetroS, Head Office Building?Nandanam,?Anna?Salai?today (26.01.2025).?Thiru.?M.A.?Siddique, I.A.S., Principal Secretary / Managing Director of CMRL hoisted the National Flag and accepted the parade salute. ? Recognizing a decade at CMRL: As part of the Republic Day celebrations, CMRL took the opportunity to?honor employees who have completed a decade of dedicated service. A total of 24 officials were presented with a Certificate of Appreciation and a memento by the Managing Director, in recognition of their valuable contributions over the years. Encouraging Sportsmanship: On Republic Day Celebrations, to encourage sportsmanship among fellow colleagues, CMRL organized a series of sports competitions for its staff, including badminton, chess,?carrom, cricket, brisk walk, and table tennis. Several employees actively participated, and prizes were awarded to 49 officials and staff members by the Managing Director during the celebrations. CMRL won the cricket competition organized by NKAB GC1.? A cricket tournament was hosted by NKAB GC1.CMRL won the tournament by competing against 16 private companies. The championship trophy was presented to the winning team by the Managing Director, adding to the festive spirit of the Republic Day observance. The Directors of CMRL namely,?Thiru.?Rajesh Chaturvedi, (Systems & Operations),?Thiru. T. Archunan, (Project),?Tmt.H.?Jayalakshmi, I.P.S., (Chief Security Officer), Senior Officials and Staff of CMRL, GC was present during the occasion.

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
      +1
  • Chennai Metro Rail Limited is inviting bids through Gem Portal for Photography and Videography documentation of the Phase 2 project. This is a great opportunity for qualified vendors to contribute to the documentation of Chennai Metro Rail’s expansion. ?? Tender ID: GEM/2025/B/5801693 ?? Last Date of Bid Submission:10-02-2025,15:00 hrs ?? Duration of Contract: 2 Years ?? For detailed information, download the Bid Document. Please visit, https://gem.gov.in/ We look forward to your participation in capturing the milestones of this transformative project.

  • 查看Chennai Metro Rail Limited的组织主页

    20,157 位关注者

    Chennai Metro Rail Limited is a pioneer in urban transportation, dedicated to providing efficient, reliable, and sustainable metro rail services. As one of the fastest-growing metro rail networks in India, CMRL plays a crucial role in enhancing connectivity and easing commuter traffic in the metropolitan area. We are inviting applications from qualified and experienced personnel for the appointment of undermentioned posts on contract basis: 1. AGM / JGM (Legal) 2. JGM / DGM (ARCH) 3. Manager (Design) Candidates are required to submit the online application along with requisite documents on or before 20-01-2025. For more details, Visit: https://lnkd.in/gvVUpxY7 How to Apply: Interested and eligible candidates are invited to apply online via our careers page. Please upload all required documents and complete your application before the deadline. Click here to apply: https://lnkd.in/gu9qucvM Join us in shaping the future of urban transportation in Chennai! #ChennaiMetro #CMRL #CareerOpportunity #JoinOurTeam #InfrastructureJobs #ApplyNow #Hiring #ChennaiJobs

相似主页

查看职位