C.D. Smith Construction

C.D. Smith Construction

建筑业

Fond du Lac,WI 9,019 位关注者

YOUR PROJECT. OUR PRIORITY.? | Building community & connecting people with integrated commercial construction expertise.

关于我们

C.D. Smith Construction is an industry leader in safely providing the highest quality commercial construction services. Utilizing an integrated approach and in-house technical expertise, our team serves as a solutions provider throughout all project phases, from planning through closeout. With veteran leadership and a dedication to our employees and clients; we proudly place our name on projects of all sizes across the United States. At C.D. Smith, we build spaces – spaces where people work, play, live, learn, heal, create, worship and serve. Whether a 20,000-square-foot addition or a new 600,000-square-foot facility, we are dedicated to building lasting relationships and safely delivering superior craftsmanship. Our talented team of project managers and support staff has the background and perspectives to partner with clients, partners, and subcontractors through the entire construction process. Each of them possesses a relentless drive to exceed your expectations.

网站
https://www.cdsmith.com
所属行业
建筑业
规模
501-1,000 人
总部
Fond du Lac,WI
类型
私人持股
创立
1936
领域
Preconstruction Services、Construction Management、Self-Performance、Design-Build、Construction Services、Virtual Design and Construction、Sustainable Construction和Construction Consulting

地点

  • 主要

    889 East Johnson Street

    P.O. Box 1006

    US,WI,Fond du Lac,54935

    获取路线
  • 241 N Broadway

    Suite 400

    US,WI,Milwaukee,53202

    获取路线

C.D. Smith Construction员工

动态

  • 查看C.D. Smith Construction的公司主页,图片

    9,019 位关注者

    Moraine Park Technical College's Automation, Innovation, and Robotics (AIR) Center is a testament to the power of community collaboration: https://lnkd.in/g9fK_K9R. The state-of-the-art facility offers enhanced spaces for software training, programming, product design, manufacturing, and robotics. It's more than just a building. The collaboration went beyond funding, with industry leaders actively shaping the curriculum to meet real-world needs. The AIR Center's impact reaches far beyond the college itself. This milestone in Moraine Park's mission ensures graduates are industry-ready and equipped to thrive, creating increased opportunities for everyone! #Manufacturing #Education #Innovation #EconomicGrowth #Construction #CareerDevelopment #Wisconsin

    查看Wells的公司主页,图片

    10,294 位关注者

    Moraine Park Technical College's Automation, Innovation, & Robotic (AIR) Center in Fond du Lac, WI, utilized a prefabricated building envelope that was installed in less than two weeks. The exterior seamlessly integrates with the existing campus buildings and provides a durable, low-maintenance facade so MPTC can focus on continuing a quality, hands-on educational experience for students. Learn more about this project here ?? https://ow.ly/Bqnn50TWxxC C.D. Smith Construction, EUA

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • 查看C.D. Smith Construction的公司主页,图片

    9,019 位关注者

    ??Exciting news! EXHIBITOR?Magazine has named the Baird Center the Best Convention Center in the 100,000 to 500,000 square feet category. This prestigious award recognizes the center's events and exhibition capabilities for providing world-class accommodations and guest experiences. EXPANSION PROJECT OVERVIEW: ???Redefining Convention Venues When it opened in 1998 as the Midwest Express Center, the convention center was designed for expansion. The recent $456 million project doubled its size, allowing it to accommodate multiple simultaneous events. This recognition from Exhibitor Group showcases Milwaukee's event capabilities. ESSENTIAL AMENITIES: ?? Unique Features ??Rooftop Baird Ballroom and Sky View Terrace: Offers breathtaking views of downtown Milwaukee, accommodating up to 2,000 guests for seated dinners, perfect for grand celebrations. ??300,000 Square Feet of Exhibit Space: Provides ample room for large-scale exhibitions and trade shows with state-of-the-art amenities. ??52 Meeting Rooms (73,400 SF): Flexible layouts with robust IT infrastructure for impactful presentations and breakout sessions. ??State-of-the-art lighting and HVAC: Color-changing light fixtures and subdividable space HVAC controls enhance the ambiance and comfort. ??Large Windows and Outdoor Spaces: Natural light floods through large windows, complemented by landscaped terraces and outdoor gathering areas. ??Inclusion-Focused Facilities: All-gender restrooms, on-site sensory rooms, and nursing mother’s rooms ensure the comfort of all attendees. ??Executive Kitchen and Loading Facilities: A second executive kitchen supports event catering needs; 22 loading bays facilitate smooth logistics. ??Indoor Parking: 400 indoor parking spaces provide convenient access for visitors. THE BOTTOM LINE: ?? A Tribute to Excellence This award celebrates more than just a building—it honors the vision, dedication, and collaborative spirit of every team member who transformed the Baird Center. It sets new standards in convention center design and reinforces Milwaukee's position as a leader in the events industry. ??To the entire Baird Center team: Your passion has expanded a convention center and elevated Milwaukee's standing on the national stage. This achievement reflects the heart and soul of our city—collaborative, forward-thinking, and always reaching higher. It positions Milwaukee as a world-class destination for visitors from around the globe, stimulating economic growth and creating new opportunities for the region. Explore more about the Baird Center expansion project at cdsmith(dot)com/bairdcenter#news. #BuildingMore #BairdCenter #MilwaukeeEvents #EventsIndustry #BusinessExcellence #EventSpaces #Construction #Milwaukee #Wisconsin

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
      +3
  • 查看C.D. Smith Construction的公司主页,图片

    9,019 位关注者

    ??Earlier this year, we announced the relocation of our Milwaukee office to 8325 West Tower Ave, Milwaukee. CATCH UP QUICK | ??Leadership Insights: “We have called the Third Ward our home base in Milwaukee since 2018, serving the surrounding area for decades. We have built solid relationships and many projects that we are proud to put our name on,” says Dave Kwiatkowski, Vice President, C.D. Smith Construction. “7Seventy7, R1VER, Bradley Symphony Center, Rite-Hite, Ascent MKE, Baird Center, and beyond. We are confident this move is at the right time for the right reasons to support our teams and clients in Southeast Wisconsin.” “We're dedicated to safely delivering superior spaces for our clients,” comments Holly Brenner, Senior Vice President of Strategic Development and Marketing. “The West Tower location will combine our office with a south yard, allowing us to streamline operations and better serve our clients.” HOW IT'S GOING | ??Growth Mindset: “Maintaining standards of excellence, quality, and safety while we evolve and grow is always top of mind. We are proud to grow our services in the Milwaukee market,” explains Justin Smith, President and CEO. Learn more about the bold projects reshaping the skyline and meet our Milwaukee team at cdsmith(dot)com/milwaukee. #MilwaukeeConstruction #BuildingMilwaukee #CommercialConstruction #MilwaukeeBusiness #SoutheastWisconsin #Milwaukee #Wisconsin

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
      +3
  • 查看C.D. Smith Construction的公司主页,图片

    9,019 位关注者

    ??Nutex Health Inc. Opens New Micro Hospital in Milwaukee?? ??PRESS RELEASE HIGHLIGHTS (Nov.18, 2024) Nutex Health Inc., a physician-led integrated healthcare delivery system, has officially opened its newest facility on Milwaukee's south side. The Milwaukee ER & Hospital, located at 1751 West Layton Ave, marks Nutex's second Wisconsin location. ??KEY FEATURES + FACILITY DETAILS The 22,325 SF, $15.4M facility is designed to provide round-the-clock concierge-level care. Key features include: ??8 emergency room beds ??6 inpatient beds ??1 procedure room ? In-house pharmacy ??Laboratory services ??Advanced imaging services (MRI, CT scans, X-rays, Ultrasounds) ????????NUTEX HEALTH'S GROWTH + COMMUNITY IMPACT The Milwaukee ER & Hospital is Nutex Health's third opening in 2024, following new locations in Green Bay, WI, and Post Falls, ID. This expansion brings advanced emergency and inpatient services to the community, offering patients convenient, efficient healthcare with minimal wait times. For the latest updates, check out the news section of the most recent blog post at cdsmith(dot)com/healthcare#news about the project. #healthcareinnovation #microhospital #modernhealthcare #Milwaukee #Wisconsin

    • 该图片无替代文字
    • 该图片无替代文字
  • 查看C.D. Smith Construction的公司主页,图片

    9,019 位关注者

    ??It's official! Baird Center expansion project received the Award of Merit in the Sports/Entertainment category at the Engineering News-Record Midwest Regional Best Projects Awards ceremony in Chicago on November 15, 2024. This recognition highlights the project's significant impact on Milwaukee's future. ??ONE BIG ACHIEVEMENT: THE BACKSTORY The $456-million expansion doubled the convention center's size to 1.3M square feet, enhancing Milwaukee's ability to host a wide range of events simultaneously. Remarkably, this massive project was completed in just 27 months, showcasing the power of collaboration and efficient planning at scale. ??NEW STANDARDS FOR SUSTAINABILITY The Baird Center sets a new benchmark for sustainable design in convention centers, reducing the facilities' environmental footprint and positioning Milwaukee as a leader in green urban development, with features including: ??Triple-silver low-emissivity glass on the facade ??Bird-friendly glass on the skywalk ??Solar array generating 98,130 kWh ??320,000-gallon underground stormwater detention system ??Orca food digester ??OVERCOMING CHALLENGES The project team demonstrated resilience and innovation in the face of supply chain constraints. By sourcing cement from multiple suppliers and adopting a new concrete type, they maintained an ambitious schedule without compromising quality. ?? A COLLABORATIVE SUCCESS With 2,359 workers contributing their skills and expertise, the expansion embodies the spirit of teamwork that drives Milwaukee forward. This collaborative effort resulted in driving 2,742 piles, using 5,852 tons of steel, and placing 48,000 cubic yards of concrete. ??WHAT'S NEXT As we celebrate this recognition, it's clear that the Baird Center expansion is more than just an award-winning project. It symbolizes Milwaukee and everything it stands for—ambition, innovation, and a commitment to sustainable growth. Since its opening in May 2024, the expanded center is attracting new events, visitors, and economic opportunities to the heart of the city, and it's poised to become a cornerstone of the financial, economic, and cultural future, attracting diverse events for years to come. ?? Photo credit with sincere thanks for capturing and sharing photos from the awards ceremony goes to our friends at Wisconsin Center District! You can learn more and check out related project news at cdsmith(dot)com/bairdcenter. #BuildingMore #BairdCenter #Milwaukee #Wisconsin #Construction #BuildingMoreOpportunity #Community

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • 查看C.D. Smith Construction的公司主页,图片

    9,019 位关注者

    ??The Ascent MKE project kicked off the rise of mass timber in Milwaukee and continues to make news. As cities seek greener building solutions, mass timber is a key ingredient in sustainable urban development. WHY MASS TIMBER MATTERS ?? Carbon Sequestering: Timber buildings store carbon in their structure for the life of the building. For example, an 18-story mass timber building has a negative carbon imprint equal to taking 2,350 cars off the road per year. ?? Innovative Construction: Prefabricated panels delivered directly to job sites can reduce construction time by approximately 25 percent, saving owners even more time and money. ?? Structural Strength: Mass timber comprises multiple solid, load-bearing wood panels bound together to create extraordinary strength and stability.?Despite being a fraction of the weight of concrete, mass timber meets rigorous safety and performance standards. As Milwaukee continues to push the boundaries of sustainable urban development, it's not just transforming its skyline – it's setting a new standard for cities worldwide. #MassTimber #SustainableConstruction #UrbanDevelopment #GreenBuilding #MassTimberConstruction #Milwaukee #Wisconsin

    查看EarthCam的公司主页,图片

    27,076 位关注者

    Did you know that the world's tallest tallest mass timber structure is in Milwaukee? C.D. Smith Construction used EarthCam's live camera integration with 3D modeling to build Ascent MKE, an award-winning 25-story high-rise. Watch the complete construction of the project in EarthCam's time-lapse. Learn more about EarthCam's visual information ecosystem for construction: https://bit.ly/4fnHHPK

  • 查看C.D. Smith Construction的公司主页,图片

    9,019 位关注者

    If one thing is clear about food and beverage facility construction, it's this: Operations leaders know it should be more efficient, builders know it should be more practical, and yet often, it's not. Because it can be challenging to integrate facility operations and maintenance insights early in the design and construction process. And there are several reasons why it's so challenging: ? Lack of collaboration among stakeholder teams ? Limited understanding of day-to-day operational needs ? Focus on initial building costs over long-term efficiencies ? Overlooking maintenance requirements in the early design phase ? Insufficient consideration of worker conditions for safety and wellness ? Neglecting energy efficiency and sustainability options ? Inadequate planning for future expansion or modifications Many of these challenges center around two blind spots: ?? Operational insight integration ?? Long-term maintenance and efficiency planning These are all issues stemming from not having a systematic approach to incorporating operational expertise into facility design and construction. Specifically in a way where: ?? Facility operator & maintenance team insights are valued & integrated ?? Design & construction teams understand real-world operational needs ?? Construction plans account for long-term maintenance ?? Efficiency and sustainability are prioritized from the start The solution sounds straightforward, but it requires a shift in mindset: If construction teams had an operations-driven approach, integrating maintenance and operational insights from the beginning, it would lead to more efficient, practical, and sustainable food and beverage facilities. Projects that use an operations + maintenance mindset and approach: ? Incorporate ample space for routine maintenance ? Integrate energy-saving technologies ? Prioritize ergonomic workspaces for improved worker comfort ? Consider dual power supplies or backup machinery for reliability ? Implement waste reduction and sustainability options ? Adhere to industry best practices, standards, and regulations The path is clear but not always easy. Join us at Booth 803 (Dec. 4-5) at the 2024 MWFPA Convention or attend a BREAKOUT SESSION on elevating your capital projects and discovering the benefits of Virtual Design + Construction (VDC) for building excellence with an operations and maintenance mindset. We hope to see you there! Meanwhile, you can learn more at cdsmith(dot)com/foodbeverage#news. #FoodProcessing #FoodProcessingPlant #FacilityConstruction #MWFPA #MWFPA24 #FoodProcessingPlant #Midwest #Wisconsin MIDWEST FOOD PRODUCTS ASSOCIATION Center for Dairy Research University of Wisconsin-Madison

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • 查看C.D. Smith Construction的公司主页,图片

    9,019 位关注者

    One-size-fits-all doesn't work in construction. Each project—be it a school, hospital, or food processing plant—has unique challenges. You need experts who understand and can work in partnership with you for a custom construction management approach. ?? K-12 Education: ? Balance tight budgets with modern educational needs ? Minimize disruptions to ongoing school operations ? Engage the community for long-term project success ?? Healthcare: ? Design spaces for patient comfort/healing and staff care/efficiency ? Future-proof facilities for evolving healthcare needs ? Maintain critical services during renovations ? Integrate LEED and WELL certifications for sustainability and wellness ?? Industrial & Food Processing: ? Optimize workflows to increase productivity ? Meet industry standards while embracing innovation ? Support increased production capacity and product safety ??♂???♀?Key Strategies | HOW WE WORK: 1. Understand industry-specific challenges 2. Partner closely with all stakeholders 3. Use technology for innovative solutions 4. Focus on sustainability and long-term value Real-World Examples: ? Kohler School District: Navigating referendum communications, preconstruction planning, and construction project management ? Nutex Health Micro-Hospital: Comprehensive care in a compact footprint ? Babcock Hall Dairy Plant: Modern construction meets rigorous industry standards for driving innovation in Wisconsin's dairy industry Effective custom construction management isn't just about building—it's about creating opportunities for sustainable growth in the short and long term. Curious about how custom solutions help ensure project success across specific industries. You can learn more by exploring real-world case studies and industry-specific insights at cdsmith(dot)com/blog. #ConstructionManagement #Healthcare #Education #Industrial #CustomSolutions #Construction #Wisconsin

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
      +4
  • 查看C.D. Smith Construction的公司主页,图片

    9,019 位关注者

    ??Modern Education CASE STUDY: Kohler School District's Facility Renovation Project?? Kohler School District's recent renovation project created modern learning spaces while prioritizing community engagement. Superintendent Lisa Green shared her insights on the project journey, emphasizing the importance of effective project management and community involvement. ??♂?TRUSTED ADVISOR ??“We felt that we were in the best and most capable hands partnering with C.D. Smith as our construction manager," says Lisa Greene, Superintendent of the Kohler School District. ??The facility is unique, particularly because the library serves both the school and the community. ? ?ON TIME | ??ON BUDGET With C.D. Smith's extensive experience in K-12 educational construction, Lisa trusted their expertise and commended their value engineering options during preconstruction, which helped keep the project within budget. ? “The completed project is both functional and aesthetically pleasing,” said Lisa. “Much of the work was carried out during school hours with minimal disruption.” ??LASTING IMPACTS The successful completion of this district-wide facility improvement project enhances educational experiences for today’s learners, showcasing how effective project management leads to successful outcomes and strengthens community connections. To get the latest news and learn more?about similar K-12 Education Projects go to cdsmith(dot)com/education#news. #EducationInnovation #SchoolRenovation #CommunityEngagement #ProjectManagement #K12Education #Kohler #Wisconsin Kohler Public Library Kohler School District

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • 查看C.D. Smith Construction的公司主页,图片

    9,019 位关注者

    ?? (24 October 2024) | ???Ascent MKE, the world's tallest hybrid mass timber building, was featured in Financial Times' latest video "Mass Timber: The Future of Construction." The recognition further highlights the global significance of the project and its contribution to sustainable urban development. More key aspects of Ascent MKE: 1. Innovative Hybrid Design??: Combining a six-story concrete base with 19 stories of mass timber, Ascent MKE showcases the versatility and potential of engineered wood. 2. Environmental Impact??: The use of mass timber significantly reduces the building's carbon footprint, aligning with global sustainability goals and setting new standards for eco-friendly construction. 3. Fire Ratings??: The project proved three fire ratings to qualify for Type I building, including the horizontal floors and ceilings achieved a two-hour fire rating, the steel connectors achieved a two-hour fire rating, and the structural timber frame (glulam columns) achieved a world-first 3-hour fire resistance rating. 4. Economic Viability??: Ascent MKE demonstrates that innovative, sustainable construction can be both environmentally responsible and economically feasible. 5. Rapid Construction??: Using prefabricated mass timber elements allowed for efficient on-site building assembly, reducing overall construction time. Advancing the Industry ?? As highlighted in the Financial Times video, mass timber construction is gaining momentum globally. Work on Ascent MKE and other mass timber projects contributes to a growing body of knowledge about mass timber construction, helping to shape the future of wood as a renewable and sustainable building material. Want to Learn More? ?? Check out Ascent MKE's cameo at 3:45 in the Financial Times video! You can also head to cdsmith(dot)com/mass-timber-construction#news to get the latest project news and more on the future of mass timber. #AscentMKE #MassTimber #SustainableConstruction #MassTimberConstruction #Milwaukee #Wisconsin

    • 该图片无替代文字

相似主页

查看职位