10MW ? MISO Greenfield Site Now In-Contract ?? via BELISARI If you are interested in getting plugged in to new and upcoming powered real estate deals, follow this link - https://lnkd.in/ggFp7F45 ----------- #datacenters? #energyinfrastructure? #HPC? #MSIO #AI #Compute #bitcoinmining? #infrastructuredevelopment #BELISARI
BELISARI
å¯å†ç”Ÿèƒ½æºæœåŠ¡
Columbus,Ohio 221 ä½å…³æ³¨è€…
The Platform for Power - Energy Siting for Flexible Data Centers
关于我们
The Platform for Power - Belisari works directly with site owners, independent power producers and utilities to bring flexible datacenter loads on-site, elevating grid stability and project economics to all parties.
- 网站
-
www.belisari.com
BELISARI的外部链接
- 所属行业
- å¯å†ç”Ÿèƒ½æºæœåŠ¡
- 规模
- 11-50 人
- 总部
- Columbus,Ohio
- 类型
- ç§äººæŒè‚¡
- 创立
- 2023
地点
-
主è¦
US,Ohio,Columbus,43212
BELISARI员工
动æ€
-
BELISARI转å‘了
At BELISARI, we are constantly introducing new features to improve the powered infrastructure site review to close process. ?? We have launched a new and improved My Account for acquisition teams to review the new energy developer sites available. Easily have your team of analysts step through the review process, including a site-by-site dataroom request and LOIs!
-
-
BELISARI转å‘了
Excited to share that BELISARI has added 10mw of power contracted for our clients. ?? We aim to drastically simplify, standardize and streamline the process of finding power, getting to contract and closing for our buyside and sellside clients. Please reach out to learn more if you are an AI/HPC operator, Bitcoin Miner, or Energy Developer with access to power. #data #datacenters #renewableenergy #energyinfrastructure #HPC #bitcoinmining #duediligence #infrastructuredevelopment
-
-
BELISARI转å‘了
If you're an HPC/AI datacenter operator or POW miner looking to expand operations, click the link below. ?? ?? ...takes <1min to get yourself in the mix for new sites coming onto the BELISARI market from 5 MW up to 500+ MW. We have sites that are ready to be built & power to be drawn asap. We have ~300MW under contract and 3GW of capacity coming up for review. ? https://lnkd.in/ggFp7F45
-
-
BELISARI转å‘了
A few people have asked what the name BELISARI means. Is it random?.. BELISARI the name is a nod to one of the greatest military minds of the Byzantine Empire, Belisarius. Known for his strategic brilliance and loyalty, he led successful campaigns against formidable adversaries such as the SÄsÄnian Empire, the Vandal Kingdom, and the Ostrogoths. Despite facing numerous challenges, Belisarius remained steadfast in his commitment to protecting and expanding the Byzantine Empire. His legacy is one of resilience and integrity—qualities we strive to embody at BELISARI. In addition to this, our name also pays homage to the 'Byzantine Generals Problem,' a fundamental challenge in the realm of distributed computing and game theory. This problem highlights the difficulties decentralized parties face in achieving consensus without a trusted central authority. Bitcoin, through its ingenious use of blockchain technology and Proof-of-Work, successfully addressed this issue, creating a trustless, decentralized financial system. See more here from River - https://lnkd.in/grD8Qdmy When working to locate and orchestrate the build of an energy infrastructure site there's a high level of trust that is involved as the process can span many years, and involve many different counterparties and skillsets along the way. Trust is very important to enable the flywheel to keep spinning!
-
-
BELISARI转å‘了
Just added two new site opportunities to the mix, both located in Louisiana. $0.049/kwh Power and meant for HPC/AI or Immersion Mining. We now have 10 active sites, with one recently closed Oklahoma, and another moving into exclusivity. - BELISARI Louisiana Size: 20,873 sq ft former Tier 3 Data Center built by AT&T, Class A hardened structure on 1.3 secured M1 zoned acres. Power: 1500kVA 480/277v transformer (upgradable to 3,000kVA), 6,000 amp Square D switch gear, expandable power lines. Cooling: 400 tons of HVAC. Safety: Waterless fire suppression, battery backup system, lightning protection system. Infrastructure: 6,000 sq ft unistrut/ladder rack, 10GB redundant fiber, full security, keyless access, and LED lighting. Capacity: 7 MW (currently running 1.5 MW) Electricity Costs: No Fixed PPA. Mixed Grid regulated power on MISO (combination of nat gas, nuclear & solar). Last month avg. cost: 4.9 cents per kWh. Ownership: Includes ownership of the land and building (LLC that owns the Data Center). Ideal for HPC (AI) Data Center and/or BTC mining. Availability: Immediate. CURRENT ASKING PRICE: $7 million Check out all opportunities here (note, for full access you'll need to be approved on platform).
-
-
New Private Sale Listing: (Sign up to access data room) ENERGY: 5.2c/kwh CAPACITY: 15MW LOCATION: USA TYPE: Turnkey PRICE: $7,000,000 www.belisari.com
-