Fun fact: The Cactus Project PEA (August 7, 2024) envisages an open pit scenario in Arizona. The M&I totals 7.3 bn pounds of copper and Inferred totals 3.8 bn pounds of copper; a 352% increase to the M&I since IPO in 2021. While the 2024 MRE is not included on this diagram, the overall Cactus Project begins at 42 metres from surface at MainSpring with a property wide strip ratio of 2:1. ? brownfield and infrastructure rich ? private land (streamlined permitting) ? open pit scenario ? low capital intensity
Management of Data, Analytics, AI & Digital Technology Projects | Strategic Mine Planning | Team Leader
Another interesting graphic - didn’t realize Resolution Copper was such an outlier. Curious to hear your thoughts!