AES performs earthwork take-offs, GPS modeling, Drone Survey, and estimating for demolition, earthwork and utility work. Visit our website for more detailed information https://www.andersonestimatingservice.com

网站
https://www.andersonestimatingservice.com/
所属行业
建筑业
规模
2-10 人
总部
Franklin,Tennessee
类型
自有
创立
2008

地点

Anderson Estimating Service员工

动态

  • Question to all my Civil contractors and Surveyors: I just received "benchmarks" on a 140 acre project that were to the nearest 100th decimal place (0.00) I was always taught that points were to the 100th and Benchmarks to the 1000th (0.000), but I am old school. Isn't it industry standard that benchmarks are to the 1000th? I am just thinking that if these are truncated or even rounded off the point could be +/- from 0.05 to 0.09 foot and then my GPS is good to the 0.05 foot. So, I could literally be off 0.10 foot or more from the get go. That is how I think of it. Is this wrong?

  • Well, today I fixed two models provided by other services. Two in one day! One of them was so messed up. I told my client that it was unusable. I am rushing to get a model out tomorrow so he can keep going. No ridge lines, Curbs offset were incorrect, No gutter lip elevations, Flat spots where there should be flow, and on and on. It was a train wreck with a school bus involved (really bad.) The other one was from a service that claimed my model was bad, and they had the client pay for a redo. I did not charge him for mine, since I have a 100% satisfaction guarantee. However, when I looked at what the other service provided, it had 2 foot busts and several bad spots. Actually, I had time to review my original "bad" model at that point. The only thing I had done wrong was I forgot to uncheck the "tin surface" when I made the line work file (dxf). So, the TIN linework would show up on the controller. Just needed to either remove it or uncheck so it didn't display. It had no affect on the functionality of the model. The surface file was fine. The engineer had provided a really clean TIN file (I verified it). So, I used it, which is extremely rare. Please, be careful who you use for models. You could end up grading things twice, which I am sure your do not put in your estimate. I hate throwing out the "40 years experience" line too much, but it kind of applies in this situation. Have a blessed day!

    • 该图片无替代文字
  • I had a project today in which I was running the refusal volumes (rock). I noticed the soils report stated the exploration was done using trenches and not a drill rig. Then I looked at the piece of equipment. It was a mini excavator! Of course, I would expect the mini-x to have refusals way shallower than a drill rig or an adult size excavator. So, this soils report is misleading, and my client will hopefully get the job knowing this. Another instance I had was a soils report that called for significant moisture remediation (It was really wet). Then I looked at the date of the borings and find out they had drilled right after a major storm. You have to watch for things like this. Again, I got the project knowing this remediation was way exaggerated. I guess these are the things you just learn along the way....

    • 该图片无替代文字
  • Anderson Estimating Service转发了

    I think I figured out a way to explain the volume calculation misunderstanding... Unless the dirt is filled/cut to the final design grade, it can't be counted in the balance of the project. You always compare everything to the final elevations. Much of the dirt on a project is, unfortunately, moved twice. You cut to grade. So, that means you actually over fill finish areas. There is also remedial work which is appropriately called over-excavation. Meaning: You excavate beyond the design grades. So, comparing the initial excavation with the progress topo will NOT give you numbers that are relevant to the final balance. You always compare topo to final design. I can explain it to you, but I can't understand it for you.

    查看Craig Anderson的档案

    AES - Earthwork Takeoffs, GPS modeling, and Drone Topos -- Earthworks, Civil, Estimator

    Help! How do I explain this... Another customer asked for drone vs existing topo quantities. The drone topo was done after they had the pads mostly up and the grading mostly done. I provided them the requested volumes. However, I put a disclaimer on the quantities that they are only the volumes as they relate to comparing these two surfaces. The volumes will not reflect the final volumes on the site. I get this request often, but typically I try and steer them into comparing the drone topo to the final grades (which is what they really want). This will give them the balance of the site. I am usually successful, but today I was not able to explain it to one of the team. Any ideas? Any way to explain that comparing a progress drone topo to the existing topo means nothing? or do you even get it?

    • 该图片无替代文字
  • I think I figured out a way to explain the volume calculation misunderstanding... Unless the dirt is filled/cut to the final design grade, it can't be counted in the balance of the project. You always compare everything to the final elevations. Much of the dirt on a project is, unfortunately, moved twice. You cut to grade. So, that means you actually over fill finish areas. There is also remedial work which is appropriately called over-excavation. Meaning: You excavate beyond the design grades. So, comparing the initial excavation with the progress topo will NOT give you numbers that are relevant to the final balance. You always compare topo to final design. I can explain it to you, but I can't understand it for you.

    查看Craig Anderson的档案

    AES - Earthwork Takeoffs, GPS modeling, and Drone Topos -- Earthworks, Civil, Estimator

    Help! How do I explain this... Another customer asked for drone vs existing topo quantities. The drone topo was done after they had the pads mostly up and the grading mostly done. I provided them the requested volumes. However, I put a disclaimer on the quantities that they are only the volumes as they relate to comparing these two surfaces. The volumes will not reflect the final volumes on the site. I get this request often, but typically I try and steer them into comparing the drone topo to the final grades (which is what they really want). This will give them the balance of the site. I am usually successful, but today I was not able to explain it to one of the team. Any ideas? Any way to explain that comparing a progress drone topo to the existing topo means nothing? or do you even get it?

    • 该图片无替代文字
  • 查看Anderson Estimating Service的组织主页

    237 位关注者

    All my projects and customers are TOP SECRET. So, I really can't say anything about it. I will say this: "Next BIG Park site" A ton of different scope items on this project. Sometimes, I really would like to discuss all the projects and consulting work I do, but it is all hush hush. I do some pretty cool projects all over the country.

    • 该图片无替代文字
  • 查看Craig Anderson的档案

    AES - Earthwork Takeoffs, GPS modeling, and Drone Topos -- Earthworks, Civil, Estimator

    I just had my credit card stolen and used by a thief. My credit card company flagged it instantly, and within a few minutes of the invalid charge the card was cancelled. Of course, being the genius most thieves are: they had Uber eats delivering food to their home. To be honest (and the point of posting this): The whole thing was totally my bad. I cut up my old card, but threw it away in the same trash bag. Dumb me! Charges will be reversed, but I am still mad at myself. I know better.

  • 查看Craig Anderson的档案

    AES - Earthwork Takeoffs, GPS modeling, and Drone Topos -- Earthworks, Civil, Estimator

    Help! How do I explain this... Another customer asked for drone vs existing topo quantities. The drone topo was done after they had the pads mostly up and the grading mostly done. I provided them the requested volumes. However, I put a disclaimer on the quantities that they are only the volumes as they relate to comparing these two surfaces. The volumes will not reflect the final volumes on the site. I get this request often, but typically I try and steer them into comparing the drone topo to the final grades (which is what they really want). This will give them the balance of the site. I am usually successful, but today I was not able to explain it to one of the team. Any ideas? Any way to explain that comparing a progress drone topo to the existing topo means nothing? or do you even get it?

    • 该图片无替代文字