AmWest Control Inc.
电器、电气和电子产品制造业
Brigthon,Colorado 226 位关注者
A premier manufacturer of electrical, instrumentation, and control systems for the water and wastewater industry.
关于我们
AmWest Control is a quality control system integrator that prides itself in performing technically challenging projects under tight time restraints. It has been proven that our technical expertise, experience, reputation, and financial strength make us not only qualified but also a local business that both Denver and Colorado can be proud of. AmWest was established in 1983 and for many years has dedicated itself to designing, fabricating, programming, commissioning and servicing systems for a large base of industrial and municipal markets. The combination of electrical and mechanical engineering disciplines form a strong team that is knowledgeable of a large variety of processes. It routinely provides integrated packages containing instrumentation, computers, programmable controllers, motor control, switch gear, process pumps, well pumps and valves.
- 网站
-
https://www.amwestcontrol.com
AmWest Control Inc.的外部链接
- 所属行业
- 电器、电气和电子产品制造业
- 规模
- 11-50 人
- 总部
- Brigthon,Colorado
- 类型
- 私人持股
- 创立
- 1983
地点
-
主要
10175 E. 106th Ave.
US,Colorado,Brigthon,80601
AmWest Control Inc.员工
动态
-
AmWest is excited to attend the Rocky Mountain Water Conference next week. Adam P. and Bryan Solensky will both be in attendance. Please reach out to either of them if you will be attending. They would love to connect! #RMWC #RMWEA
-
We at AmWest Control are thrilled to have played a key role in the Roberts Tunnel Upgrade alongside our partners at Sturgeon Electric Company, Inc., CED Denver, and Eaton. Delivering this complex project for Denver Water during the unprecedented challenges of COVID-19 was no easy feat, but through collaboration, creativity, and sheer determination, we achieved remarkable results. Our team is especially proud of the pictured panel, which stands as the largest ever built in AmWest's history. It serves as a testament to the dedication and expertise of our workforce and the powerful partnerships we've cultivated within the industry. Working alongside Sturgeon Electric was a true pleasure. Their professionalism and commitment to excellence perfectly complemented our own approach, ensuring a smooth and successful project execution. We also extend our sincere gratitude to CED and Eaton for their invaluable support and collaboration throughout the process. Together, we overcame the obstacles presented by the pandemic and delivered a project that exceeded expectations. This success story is a true reflection of the power of collaboration, innovation, and unwavering commitment to quality. #AmWestControl #SturgeonElectric #CED #Eaton #DenverWater #Collaboration #SuccessStory #EngineeringExcellence
When unexpected challenges arise, we find solutions. Take our work on the Roberts Tunnel East Portal hydroelectric project for example. When supply chain delays threatened to add significant costs to our customer, our team worked with Denver Water and other project team members to find an alternative to meet the essential deadline. It required intense planning and execution, and our team members showed their dedication to the project and customer by working 12-16-hour days, seven days a week, for three weeks to ensure the plan succeeded. Find out more about this award-winning project: https://lnkd.in/gQknYhPs #SturgeonElectric #MYRGroup #hydroelectric #projectcertainty #ACEAwards #electricalconstruction