AlexRenew的封面图片
AlexRenew

AlexRenew

公用事业

Alexandria,VA 3,683 位关注者

Alexandria, Virginia’s regional wastewater treatment provider. For assistance, call 703-721-3500.

关于我们

Alexandria, Virginia’s regional wastewater treatment provider, treating an average of 38 million gallons of wastewater per day from over 300,000 customers in Alexandria and portions of Fairfax County, Virginia. Our office at 1800 Limerick St. is open 8:00 a.m. to 5:00 p.m. Mon-Fri. For assistance, call 703-721-3500.

网站
https://www.alexrenew.com
所属行业
公用事业
规模
51-200 人
总部
Alexandria,VA
类型
政府机构
创立
1952
领域
Public Utility和Wastewater Treatment

地点

  • 主要

    1500 Eisenhower Ave.

    US,VA,Alexandria,22314

    获取路线

AlexRenew员工

动态

  • 查看AlexRenew的组织主页

    3,683 位关注者

    One year ago today at 10:10 am, Hazel and her dedicated crews broke through a flooded shaft at Pendleton Street, finishing her mission of building the 2.2-mile Waterfront Tunnel over 16 months. With the Waterfront Tunnel complete, work continues on above ground structures. When fully operational, combined sewage overflows into the Potomac River will be significantly reduced.

    • 该图片无替代文字
  • 查看AlexRenew的组织主页

    3,683 位关注者

    At the end of Pendleton Street, a new seawall has been revealed now that the temporary cofferdam has been removed. This spring and summer, crews will be busy constructing the new public promenade that will sit on top of this structure and offer sweeping views of Oronoco Bay and the Potomac River.

    • 该图片无替代文字
  • 查看AlexRenew的组织主页

    3,683 位关注者

    AlexRenew is committed to restoring areas around our construction sites. Along Hooffs Run, that includes the African American Heritage Park, where we are adding wayfinding signs and a legacy grove to honor Alexandria's rich African American history. Unveiling in June!

    • 该图片无替代文字
  • 查看AlexRenew的组织主页

    3,683 位关注者

    From the highest point on AlexRenew's treatment plant, you can see our Superstructure coming together. The critical facility sits atop the pumping station & coarse screen that will be the first steps in the treatment process for the combined sewage flows captured by the Waterfront Tunnel when operational.

    • 该图片无替代文字
  • 查看AlexRenew的组织主页

    3,683 位关注者

    We're hiring an Asset Manager ?? Are you a strategic thinker with a passion for maximizing performance? Do you thrive in a fast-paced environment where your expertise can make a real impact? AlexRenew is looking for an experienced Asset Manager to join our dynamic team! Apply today: https://bit.ly/40gQ1dT

    • 该图片无替代文字
  • 查看AlexRenew的组织主页

    3,683 位关注者

    AlexRenew's construction site changes each week as the superstructure takes shape. Below the superstructure is a 14-story (underground) pumping station that will move combined sewage, captured by the Waterfront Tunnel, to our plant for treatment.

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字

相似主页

查看职位