Testing and commissioning (T&C) is a crucial phase of any project engineering process, as it ensures that the system or equipment meets the design specifications and operates as intended. However, T&C is not only about verifying the performance and functionality of the project deliverables, but also about learning and improving from the feedback and lessons learned during and after the T&C activities. In this article, we will discuss some of the best practices and methods for capturing, analyzing, and applying the T&C feedback and lessons learned to enhance the quality and efficiency of future projects.
-