What are the best practices for using MRP to size lots?
Material requirements planning (MRP) is a system that helps manufacturers plan and control their inventory, production, and purchasing. MRP uses information from the master production schedule, the bill of materials, and the inventory records to calculate the quantity and timing of materials needed for each product. One of the key decisions in MRP is how to size the lots, or batches, of materials that are ordered or produced. Lot sizing affects the trade-off between holding costs, ordering costs, and setup costs. In this article, we will discuss some of the best practices for using MRP to size lots.